
Installing your ZEVNI A04784 Madolen 12 Inch Wide Gold 3 Light Chandelier? Here's a simplified guide to help you through the process, always prioritizing safety.
First, for your safety, turn off the electricity at your home's main fuse box or circuit breaker before starting any work.
Prepare the Fixture: Begin by threading the fixture wires through the iron washer, then the plastic spacer, the glass shade, and finally, the cover. Attach the quick link to the chain and loop on the cover. Weave the fixture wires through the chain, in and out of every other link, for a neat and organized setup.
Mounting the Chandelier: Remove the collar ring from the collar loop. Secure the single bar to your outlet box. Lift the canopy over the collar loop and secure it with the collar ring. Pass the chain through the collar ring and canopy. Attach the quick link to the collar loop and guide the fixture wires through to the top of the threaded part.
Wiring and Securing: Connect the wires according to the wiring chart included with your ZEVNI chandelier, ensuring secure connections. Once wired, carefully secure the canopy in place.
Finishing Touches: Install the light bulbs (not included) into the chandelier, making sure not to exceed the maximum wattage specified. Double-check all connections and components before restoring power.
For a smooth installation, always refer to the complete instruction manual provided with your ZEVNI Madolen Gold Chandelier. If you have any doubts, or if any step feels unclear, consult a qualified electrician. Your safety and satisfaction are paramount.


