Ensuring a proper seal with the DANCO 10839X PlugAll Test and Seal Plug is straightforward when you follow these steps:
For 1½" Pipes:
- Insert the plug into the pipe.
- Turn the nut clockwise until the PlugAll no longer easily slips inside the pipe.
- Tighten the nut a maximum of 2 full turns.
- After installation, check carefully for any leaks.
For 2" Pipes and 1½" & 2" Cleanouts:
- Place the plug into the pipe opening.
- Tighten the nut clockwise until it is hand-tight only. Avoid over-tightening.
- Conduct a post-installation leak check to confirm a secure seal.
Important Considerations:
- 1½" Pipes: Limit nut rotation to a maximum of two full turns to achieve a secure fit.
- 2" Pipes and Cleanouts: Hand-tighten the nut to prevent damage or over-compression.
- Safety First: When pressure testing the plug, maintain a safe distance from the test area to avoid any potential hazards. By adhering to these steps, you can confidently install and verify the seal of your DANCO PlugAll Test and Seal Plug, ensuring effective leak prevention.