
To adjust the hanging length of your Progress Lighting P550132-031 Two-Light Wall Lantern during installation, follow these steps. First, decide on the desired hanging length and remove chain links (GG) as needed. It's best to wait until you've determined the perfect length before cutting the electrical and ground wires. Remember to leave at least 6 inches of wire extending past the chain holder (EE) for easy connections. Next, open a chain link at one end of the chain (GG) and attach it to the chain loop (B), securing it with pliers. Then, open the quick link (1) and attach the other end of the chain (GG) along with the chain holder (EE), closing the quick link. Now, thread the wires through every third chain link (GG) and pass them through the collar (DD) and canopy (HH). After that, strip 3/8" of insulation from the electrical wire ends. Connect the ribbed fixture wire to the white supply wire and the smooth fixture wire to the black supply wire using wire nuts (BB), and connect the ground wires. Finally, tuck the wires into the junction box, slide the canopy (HH) over the chain holder, and thread the collar (DD) onto the chain holder to secure the canopy to the wall.


