
To properly install your NOTIFIER BB-55 Peripherals Enclosure, follow these steps as outlined in the instruction manual. First, position the enclosure at least 6 inches (15.24 cm) below your fire alarm control panel (FACP). When surface mounting both units, align the knockout in the bottom-right corner of the FACP directly above the knockout in the top-right corner of the enclosure. Use the six provided holes to mount the enclosure in a clean, dry location free from vibrations. For wiring, utilize the 0.875 in. (2.2225 cm) knockouts, which are compatible with standard 0.75 in. (1.905 cm) conduit. Adhering to these instructions will ensure correct installation and optimal performance of your NOTIFIER BB-55 Battery Peripherals Enclosure.


