Installing a Moen 69000 Two-Handle Widespread Lavatory Rough-In Valve requires careful attention to detail. Here's a step-by-step guide to help you through the process:
- Begin by applying sealant to the underside of the Mounting Shank (A). Then, insert the Mounting Shank (A) into the sink deck opening.
- For sink decks thinner than 1 inch, attach the Mounting Bracket (C) and the Mounting Plate (E) onto the Mounting Shank (A).
- Use the Mounting Tool (J) to attach to the Mounting Bracket Nut (F) and tighten the nut.
- Insert the hot and cold valve bodies (H) and (I) through the Mounting Washers (B).
- Slide the Mounting Washer (D) and Mounting Ring with screws (G) onto the valve body (H). Hand-tighten these components.
- Remove the Protective Sleeves (L) from the valve bodies.
- Connect the Quick Connect Hose (K) to the bottom of the Spout Shank (A), pushing it up until you hear a distinct "click."
- Attach the ends of the Quick Connect Hose (K) to each valve body, ensuring the arrows on the hose face upwards.
- Turn the stems of the Valve Bodies (H) and (I) to the closed position.
- Apply thread seal tape to the threads of the Drain Body Tailpiece (U) before inserting it into the Upper Drain Body (Y).
- Install the Pivot Rod (R) into the Upper Drain Body (Y) and tighten it.
- Push the Upper Drain Body (Y) and Drain Flange (N) into the sink hole opening. Secure them by tightening the Drain Nut (P).
- Finish the installation by snapping the Waste Cap (M) into the sink drain opening.
Following these steps carefully should enable you to correctly install your Moen 69000 valve. Remember to consult the Moen instruction manual for further assistance or contact Moen customer support if you encounter any difficulties.