···
Log in / Register

How do I install the LITHONIA LIGHTING DLSD2 LED Sconce Diffuser onto its wall bracket?

1 Answers
VonAmelia
12/17/2025, 04:41 PM

Installing your LITHONIA LIGHTING DLSD2 LED Sconce Diffuser correctly is straightforward. Here's a step-by-step guide:

  1. Preparation is Key:

    • First, gather all components. Ensure you have everything listed in the fixture's packing list.
    • Safety first! Turn off the power at your circuit breaker before you begin.
  2. Assembly Steps:

    • Begin by attaching the Mounting Brackets to the housing using the Screws. Use two screws per bracket.
    • For the DLSD2 model (and DLSD1, DLSD5, DLSD7, DLSD8, DLSD9, DLSD10, DLSD11, DLSD12, DLSD16, and DLSD17 models), proceed as follows:
      • Carefully position the Diffuser over the Mounting Brackets, aligning the holes in the diffuser with those in the brackets.
      • Secure the diffuser to the brackets by using Screws.
      • Refer to Figure 8 in your manual for visual aid.
  3. Further Assistance:

    • If you encounter any issues, consult the Troubleshooting Guide in the manual.
    • For more specific support, please contact Technical Support at (800) 748-5070.
    • To clean, use a soft cloth for the fixture and a mild soap and water solution for the glass shade. Avoid any abrasive cleaners.
Was this review help?
16
4
Share
More Forum Discussions

How do I set up and program my SIEMENS QFA1000 Room Humidistat?

Setting up and programming your SIEMENS QFA1000 Room Humidistat involves a few straightforward steps. Here's a guide to help you get started: Mounting the Humidistat: Select a suitable wall location, avoiding direct sunlight, drafts, and heat sources. Use the provided mounting template to mark the hole positions. Securely attach the humidistat to the wall using appropriate screws and anchors. Wiring the Humidistat: Consult the wiring diagram in the manual to connect the humidistat's wires to your HVAC system or humidifier. Always turn off the power supply before making any electrical connections to ensure safety. Initial Setup: Once mounted and wired, connect the humidistat to a power source and turn it on. Follow the initial setup instructions in the manual to configure the desired humidity level and other initial parameters. Programming Your Humidistat: Use the control buttons on the SIEMENS QFA1000 to navigate through the menu options. Refer to the programming section in the manual to learn how to adjust settings, such as the humidity setpoint, fan control, and other functions. Testing and Calibration: After programming, test the humidistat to verify its operation. If possible, use a separate hygrometer to check the room's humidity and calibrate the SIEMENS QFA1000 if necessary to ensure accurate readings. Maintenance and Troubleshooting: Consult the manual's maintenance and troubleshooting section for guidance on regular upkeep and common issues that may occur. By following these steps and referring to the detailed instructions in your SIEMENS QFA1000 Room Humidistat manual, you can effectively set up, program, and maintain your humidistat for optimal humidity control.
14
4
Share

Need BLACK+DECKER BD17203 Rapid Induction Area Heater Assembly Instructions

Assembling your BLACK+DECKER BD17203 Rapid Induction Area Heater is straightforward when following these steps. First, turn the tank housing upside down and attach the wheel assembly to its base using two M8 x 16 screws. Next, secure the three anchoring arms to the base of the tank housing with six M6 x 12 screws and six M6 nuts. Then, fasten the belt inside the tank housing using one M5X12 screw and one M5 nut. Align the burner holes with the top of the tank housing, ensuring the control panel aligns with the door. Attach the burner using four M5 x 12 screws and four M5 nuts, tightening them securely. Remove the three preassembled M5 nuts from the upper supporters and slide the supporters into the slots at the top of the burner, securing them with the removed nuts. Remove the three preassembled screws from the top of the burner and attach the glass tube ring using these screws, ensuring a tight fit. Assemble the radiation screens by attaching the upper screen to the lower screen using three M8x75 studs and three M8 nuts. Attach the reflector to the radiation screen assembly using three M6x60 studs, three M6 washers, and three M6 cap nuts. Place the reflector onto the upper supporters and secure it with the screws removed earlier. Insert the glass tube into the glass tube ring. Attach the three mesh guards to the hooks on the upper supporters. Finally, place a propane gas tank (not included) into the tank supporter and tighten the belt to secure it. Remember to close the door before use after connecting the tank to the regulator. These steps will guide you through assembling your BLACK+DECKER BD17203 Rapid Induction Area Heater.
13
5
Share

Need help installing the Progress Lighting P560350-31M Matte Black Outdoor Wall Light, how do I start?

Installing your new Progress Lighting P560350-31M Matte Black Outdoor Wall Light is straightforward when following these steps. First, gather all necessary tools: a Phillips screwdriver, pliers, wire stripper, safety glasses, electrical tape, and a ladder. Safety is paramount; always turn off the main power supply before beginning. Ensure all parts are present by checking the contents against the included diagram. If any parts are missing or damaged, contact Progress Lighting customer service before proceeding. Begin by attaching the mounting plate to your outlet box using the provided screws. Next, strip 3/8" of insulation from the electrical wire ends. Connect the white fixture wire to the white supply wire and the black fixture wire to the black supply wire using wire nuts, then connect the ground wires. Securely attach the fixture to the mounting plate. Carefully attach the glass shade using the socket ring, and install a compatible light bulb (maximum 100-watt incandescent medium base, SBCFL, or SBLED) into the fixture socket. Remember to shut off the power before cleaning or changing bulbs. Wipe the fixture with a damp cloth; avoid abrasive cleaners or alcohol-based products. For any assembly questions or to report missing parts, contact Progress Lighting customer service for assistance.
5
0
Share

What is the recommended usage time for the InTeLLineTIX 07241 Quad Thigh Therapy Wrap to alleviate pain?

For optimal pain relief, the InTeLLineTIX 07241 Quad Thigh Therapy Wrap should be used for 25 to 45 minutes per session, as advised in the product's instruction manual. Ensure the Hub's nodes are positioned correctly, encompassing the area of discomfort or muscle tension on your quad or thigh. To power off the device after use, hold the power button for two seconds. Keep the Hub ready for the next session by recharging it with the included USB charger.
11
0
Share

How do I install and operate my celexon Electric Professional Plus Electric Projector Screen?

Installing and operating your celexon Electric Professional Plus Electric Projector Screen is straightforward. Here's a helpful guide: Installation Steps: Ceiling Mounting (Eyelets): Measure the distance between the eyelets on the screen housing. Mark these points on your ceiling. Drill appropriate holes into the ceiling. Securely attach the projector screen using suitable fixings. Ceiling Mounting (Screwed): Measure the distance between the mounting holes on the side caps of the screen housing. Transfer these measurements to the ceiling. Drill holes into the ceiling at the marked locations. Insert appropriate mounting hardware. Attach the projector screen securely to the ceiling. Wall Mounting: Measure the distance between the mounting holes on the side caps. Transfer the measurements to your wall. Drill holes into the wall. Use suitable wall plugs (dowels) and screws appropriate for your wall type. Hang the screen securely on the wall. Operation: Wall Control Box: Safety First: Ensure the power plug is correctly inserted into a grounded outlet with the correct voltage. Mount the control box in a convenient location. Extend or retract the screen using the arrow buttons on the control box. Remote Control: Safety First: Plug the screen into a grounded outlet with the correct voltage. Ensure a clear line of sight between the remote control and the screen's control box. Use the arrow buttons on the remote control to extend or retract the screen. Additional Information: Setting Stop Points: Consult with your celexon dealer for instructions on how to set the upper and lower stop points for your screen. Compliance: Your celexon Electric Professional Plus Electric Projector Screen meets EU and UK directives. For disposal, please follow local regulations for the separate collection of electrical devices, helping to protect the environment.
7
2
Share

How do I install the Panasonic ET-MDNDP10C DisplayPort 2 Interface Board into my projector?

Installing the Panasonic ET-MDNDP10C Interface Board for DisplayPort 2 Input into your projector requires careful attention to ensure a smooth and safe process. Follow these steps to correctly install the board: Power Down Your Projector: Begin by completely turning off your projector. Consult your projector's operating instructions for the proper power-down procedure. Prevent Static Discharge: Before handling the interface board, take precautions to prevent static electricity damage. Avoid touching the connector section directly. Ground yourself by touching a metal surface before you begin. Safety First: Be cautious during installation. The edges of the projector's slot opening and the interface board's bracket can be sharp. Handle with care to avoid any injuries. Installation Procedure: a. Remove the Slot Cover: Locate and remove the blank slot cover from your projector. b. Remove Securing Screws: Unscrew and remove the four screws that secure the slot cover. c. Insert the Interface Board: Align the guide groove on the Panasonic ET-MDNDP10C Interface Board with the salient of the slot. Carefully insert the board's bracket firmly into the projector slot. d. Secure the Board: Reattach the four screws you removed in step b to fix the Interface Board in place. Post-Installation Tips: Always replace the slot cover if the interface board is removed. If you remove the Interface Board, store it safely in an antistatic bag to protect it from damage. By following these steps, you can successfully integrate the Panasonic ET-MDNDP10C Interface Board and enjoy DisplayPort 2 connectivity with your projector.
5
3
Share
Cookie
Cookie Settings
© 2025 Servanan International Pte. Ltd.