How Long Does It Take to Pick Up the Exeed Landmark?
1 Answers
Exeed Landmark pickup usually takes about 1-2 months. Exterior Design: With its large body size, the Exeed Landmark boasts an overall grand design. The front grille is notably expansive, complemented by three thick and robust chrome trim strips that enhance the vehicle's sense of power. Powertrain: The Exeed Landmark is equipped with a 2.0T engine available in both high and low power variants. The low-power version delivers a maximum power of 254 horsepower and a peak torque of 390 Nm, while the high-power version offers 261 horsepower and 400 Nm. The transmission system across all models is a 7-speed wet dual-clutch gearbox.