Can the Song Plus DMP be delivered by the end of the year?
2 Answers
Song Plus DMP can be delivered by the end of the year, as it was announced by the Ministry of Industry and Information Technology in June. Below are the detailed specifications of this vehicle: Basic parameters: The dimensions are 4705x1890x1670mm, with a top speed of 180km/h and a curb weight of 1975kg. Powertrain: Equipped with a 1.5T engine, producing 102kw, with an engine net power of 96kw. The drive motor is a permanent magnet synchronous motor, with a rated power of 70kW/65kW and a peak power of 145kW/120kW. The combined fuel consumption is 1.1L/100km.
As a frequent visitor to 4S shops who just inquired about the Song PLUS DM-p for a friend, here's the situation: the car currently has quite a full order queue, mainly depending on three factors: first, the configuration you ordered—top trim versions generally have a waiting period of over 12 weeks; second, regional subsidy policies—some cities in Guangdong prioritizing production for year-end sales pushes; third, financing options—full payment orders often get delivery half a month faster than loans. I recommend asking the salesperson to check the factory order system directly—some 4S shops that placed orders in September are just now scheduled for December delivery lines. In my provincial capital city, the salesperson frankly said orders placed now will likely wait until after Chinese New Year, unless someone cancels their reservation.