···
Log in / Register

who discovered sofa

1Answers
McAdelyn
12/01/2025, 07:49:57 AM

Hello there! That's a fantastic question. The provided search results unfortunately didn't contain the specific article text to answer this, but it's a really interesting story!

No single person can be credited with inventing the sofa. Instead, it’s a piece of furniture that has evolved over thousands of years. The word "sofa" actually comes from the Arabic word "suffah," which referred to a wooden bench covered with cushions and blankets.

The earliest forms of sofas were used by ancient Egyptian pharaohs and wealthy Romans, but these were more like hard benches or daybeds used for reclining and were seen as a symbol of status, not for everyday comfort.

The cozy, upholstered sofa we all know and love today began to take shape in Europe during the late 16th and 17th centuries. It wasn't the brainchild of one specific inventor but the result of the gradual work of many anonymous craftsmen who improved upholstery techniques, adding padding, springs, and luxurious fabrics. So, while we can't name a single discoverer, we have centuries of furniture makers to thank for creating the comfy centerpiece of our living rooms.

Was this review help?
102
Share
More Q&A

How do I adjust the hanging height of my ZEVNI Janek Brass-Black Industrial Cone Mini Pendant Light during installation?

Adjusting the hanging height of your ZEVNI A04705 Janek Brass-Black Industrial Cone Mini Pendant Light involves a few simple steps. First, detach the mounting plate from the canopy by unscrewing the nuts (G). Then, choose the tubes (H) that will give you the desired hanging height. Thread the fixture wires through these tubes, the swivel joint (F), and the canopy (E). Ensure all threaded pipes are securely tightened, and then connect the chosen tubes (H) to the swivel joint (F) and the arm (I). Hand-tighten until snug. Attach the mounting plate (C) to your outlet box using mounting screws (B). Connect the wires according to the included instructions, using wire connectors and electrical tape. Raise the canopy (E) to the ceiling and secure it by tightening the nuts (G) onto the screws on the mounting plate (C). If the canopy isn't flush with the ceiling, adjust the screws on the mounting plate by unscrewing the pre-assembled hex nuts, adjusting the screws, and then tightening the nuts again. Once the light is mounted, attach the lampshade (L), socket (K), and bulb. You can also adjust the light direction by slightly loosening the joint (J), moving the socket (K) to your desired angle, and then tightening the joint (J). For any installation issues, consult the manual or contact ZEVNI customer support.
111
Share

How do I clean the grease filters on my Arietta LIB0178580 range hood for peak performance?

Maintaining your Arietta LIB0178580 Convertible Canopy Pro Style Wall Mount Hood's grease filters is key to its efficient operation. Here's how to clean them: Filter Removal : Locate the spring release handle on the filter and pull it outwards. This will allow you to carefully remove the filter from the hood. Cleaning the Filters : You have two main options for cleaning the aluminum grease filters. You can place them in your dishwasher or hand wash them with a hot, soapy solution. Reinstallation : To put the clean filter back in, make sure the spring release handles face the front. Insert the filter into the upper track first. Then, push in the spring release handle. Finally, push up on the filter and release the handle; this will latch it securely in place. Additional Advice for Optimal Performance : For best results and to ensure your Arietta hood functions flawlessly, remember these points: Clean the hood and grease filters regularly. Never operate the hood without properly installed grease filters. Avoid harsh abrasive cleaners like steel wool or soap-filled scouring pads on the exterior surfaces to prevent damage. Always wipe all surfaces dry after cleaning to prevent water spots. Do not use cleaning agents that contain bleach, as these can damage the hood's finish. For more detailed instructions and safety information, always consult the Arietta LIB0178580 Convertible Canopy Pro Style Wall Mount Hood's user manual.
119
Share

How do I choose the right chain length for my Quoizel RCE1909EK outdoor lantern based on my ceiling height?

To determine the correct chain length for your Quoizel RCE1909EK 1-Light 9-inch Earth Black Outdoor Hanging Lantern, consider your ceiling height. The installation guide provides specific recommendations to ensure your lantern hangs at the optimal height. For an 8-foot ceiling, use 11 chain links and 2 quick links. For a 9-foot ceiling, use 21 chain links and 2 quick links. If you have a 10-foot ceiling, use 31 chain links and 2 quick links. These guidelines help ensure proper lantern positioning and a secure installation. If you're unsure or need further assistance, consult a qualified electrician or contact Quoizel Customer Care.
105
Share

What are the steps to install the Danfoss FHM-C1 Compact Mixing Shunt?

Installing the Danfoss FHM-C1 Compact Mixing Shunt involves several key steps. First, prepare by gathering all necessary tools, fittings, and materials based on your specific system setup. Next, select an appropriate location, considering factors like accessibility and proximity to your heating system. Securely mount the mixing shunt to a stable surface using the appropriate hardware. Then, connect the supply and return pipes to their designated ports, ensuring leak-free connections; refer to the piping diagram in the Danfoss manual for precise guidance. If electrical connections are required, carefully follow the wiring diagram provided in the manual. After installation, commission the unit according to the manual's procedures to guarantee proper function. Finally, test the shunt to confirm it's operating correctly and achieving the desired temperature control. For detailed, product-specific instructions, always consult the Danfoss FHM-C1 Compact Mixing Shunt installation manual. For assistance, contact Danfoss customer support.
102
Share

How do I configure the baud rate, parity, and data bits on my NION-232B board?

To configure the NION-232B board for communication, you'll need to adjust the baud rate, parity, and data bits. Here's how: Baud Rate Configuration: Your NION-232B likely came pre-configured, so check your specific application's requirements first. Use switch S2 to adjust the baud rate settings. Consult the following table for switch positions: Baud Rate Switch Position 4 Switch Position 5 Switch Position 6 600 Off On On 1200 On Off On 2400 Off Off On 4800 On On Off 9600 Off On Off Parity Settings: Use switch positions 2 and 3 to configure parity. Refer to this table: Parity Switch Position 2 Switch Position 3 None On On Odd On Off Even Off Off Data Bits Settings: Use switch position 1 to configure data bits. See this table: Data Bits Switch Position 1 8 On 7 Off Important Considerations: If the connected device needs 9 data bits, set the NION-232B to 8 data bits and use either Even or Odd parity. Make sure that the NION-232B board settings are identical to the RS-232 serial port settings of your control panel to guarantee successful communication. Always refer to the NION-232B's manual for detailed instructions and the most up-to-date switch settings.
119
Share

How do I schedule the installation of my Schneider Electric AGS Automatic Generator with APC-UPS?

Scheduling the installation of your Schneider Electric AGS Automatic Generator with APC-UPS is a straightforward process. Here's how to do it: Complete the AGS Info Form: Begin by filling out the AGS Info Form. Be sure to include all necessary details, such as your contact information, the specific service requirements for your generator and UPS system, the UPS model and serial number, and the warranty period. Separate APC Global Service Order: Make sure that the APC Global Service Order is separate from your AGS Info Form. Proof of Purchase: Have your proof of purchase readily available. If there is a difference of more than three months between the serial number's date and the purchase date, ensure you have the appropriate documentation. Email the Order: Email the completed order form to APC Thailand at itdplanner@schneider-electric.com . Specify Installation Date: Clearly state your preferred installation date within the order form. Prepare the Installation Site: Ensure the installation site is fully prepared for the Field Service Engineer. This includes making sure the UPS unit is accessible for installation and having the power system ready as per the requirements. Coordinate with the Installation Team: Contact the appropriate service center or installation team in your area to confirm the appointment and finalize all installation details. Pre-Installation Check: Before the scheduled installation, review the Pre-Installation Checklist provided in your manual. This will ensure that all necessary requirements are met. By carefully following these steps and providing all the requested information, you can ensure a smooth and efficient installation of your Schneider Electric AGS Automatic Generator with APC-UPS.
114
Share
Cookie
Cookie Settings
© 2025 Servanan International Pte. Ltd.