Installing your Spence FTE Series Float and Thermostatic Steam Trap correctly ensures optimal performance. Here's a step-by-step guide:
-
Positioning and Orientation:
- Place the trap in an easily accessible location for maintenance.
- Make sure the float direction is pointing downwards during installation.
- Install the trap vertically and level for proper operation.
-
Flow Direction and Equipment Proximity:
- Confirm the flow direction using the arrow on the trap body and the float direction using the arrow on the nameplate.
- Position the trap below and close to the equipment it's draining to minimize horizontal piping.
-
Piping Considerations:
- Angle all horizontal inlet lines towards the steam trap to prevent water hammer.
- Incorporate a dirt pocket and strainer with a blowdown valve upstream of the trap.
- Use union fittings and shut-off valves on both sides of the trap for easy servicing and testing.
-
Testing and Maintenance:
- Install a test valve on the outlet pipe and cap it for testing.
- Before use, blowdown the piping with full steam pressure for five minutes to clear any debris.
- Perform maintenance and cleaning shortly after startup (2-3 days), and then every 6-12 months during regular use.
Following these steps helps maintain the effectiveness and lifespan of your Spence FTE Series Float and Thermostatic Steam Trap. For more detailed instructions, always consult the official installation guide included with your product.