···
Log in / Register

is a 1967 half dollar worth anything

1Answers
AndrewRose
12/01/2025, 02:54:09 AM

Well, the provided context was about as useful as a screen door on a submarine, offering fascinating insights into YouTube's legal disclaimers but zero details about your coin. So, let's toss that aside and get down to brass tacks, or in this case, silver-clad ones.

The short answer is yes, your 1967 half dollar is definitely worth more than the 50 cents it claims to be, so don't go spending it at the vending machine just yet. You've got what's known as a "silver clad" coin. It's not the 90% silver powerhouse that its 1964 predecessor was, but it wasn't a total sellout to cheaper metals yet, either. The 1967 Kennedy half dollar is 40% silver.

Because of this silver content, its base value is tied to the current market price of silver. This "melt value" typically fluctuates somewhere in the range of $3 to $5, depending on the day. Think of it as a small, metallic savings bond that has already matured.

Now, before you start planning your early retirement, you should know that they minted hundreds of millions of these coins. Because they aren't rare, a standard, circulated 1967 half dollar isn't going to fetch a massive premium from collectors. Its value is almost entirely in its silver. The exception, as always, is if your coin is in pristine, uncirculated condition or has a funky minting error, but for the average coin found in a drawer, its worth lies in its silvery soul.

Was this review help?
112
Share
More Q&A

How do I securely attach the panels of my Ashley B488-53 Twin Panel Bed during assembly

To ensure the stability and safety of your Ashley B488-53 Furniture Twin Panel Bed, it's crucial to properly secure the panels during assembly. Here's how to do it effectively: First, always follow the assembly steps in the order provided in the instruction manual. Use the recommended tools specified in the instructions to tighten all connectors, such as bolts and screws, securely. Before you begin attaching the panels, double-check all packing materials to make sure no small parts have become dislodged during shipping. Align the panels correctly according to the instructions before securing them. Use the correct bolts or screws to attach the panels to the frame, tightening them firmly to eliminate any wobbling. Never skip any assembly steps, as this could compromise the bed's stability. After assembly, regularly check all connectors to ensure they remain tight, and tighten any that loosen over time. Keeping the instruction manual is also a good idea for future reference. By following these steps and ensuring all connectors are properly secured, you'll assemble your Ashley B488-53 Twin Panel Bed safely and correctly.
101
Share

How do I install the FEIT Electric LEDR56HO High Output LED Recessed Downlight?

Installing the FEIT Electric LEDR56HO LED Recessed Downlight is a straightforward process. First, and most importantly, turn off the power at the circuit breaker or fuse box to ensure your safety. Next, if there's existing trim in your recessed housing, remove it to make way for the new downlight. Depending on your setup, you might need to adjust the lampholder bracket, sliding it to its highest position. You may need to remove the lampholder from the bracket by unscrewing the wing nut. Don't forget to attach the provided label to your existing luminaire. Now, install the medium base adapter into the existing fixture's socket. Securely connect the two terminals together. Then, insert the torsion springs into the fixture housing brackets. If you're working with a 5-inch recessed housing, move the torsion spring from the 6-inch position to the 5-inch position before installation. Finally, carefully push the FEIT Electric LEDR56HO LED downlight into the fixture until it sits flush with the ceiling. Ensure it is securely fitted. If you have any trouble, or if you are unsure about any step, it's always best to consult a qualified electrician for assistance.
110
Share

How do I adjust the spindle retaining spring on my Scheppach DP16SL drill press?

If you're experiencing issues with the spindle return speed on your Scheppach DP16SL drill press, adjusting the retaining spring can help. Here's how, based on the manual's instructions: First, lower the drill press table for better access. Then, work on the left side of the machine. Insert a screwdriver into the front lower notch to hold it in place. Next, use a flat spanner to remove the outer locknut. Carefully loosen the inner locknut until the cut-out is free from the boss, remembering that the spring is under tension. Now, use a screwdriver to turn the spring cap anti-clockwise until the notch can be pressed into the boss. Lower the spindle to its lowest position and hold the spring cap. Adjust the cap until the spindle moves up and down at your preferred speed. Retighten the inner locknut. If the spindle return is still too slow, repeat the adjustment, and if it's too fast, reverse the process. Finally, tighten the outer locknut against the inner locknut, but avoid over-tightening to maintain smooth spindle movement.
109
Share

How can I ensure my Ashley B488-53 Twin Panel Bed panels are securely assembled and stable?

To ensure your Ashley B488-53 Twin Panel Bed is assembled safely and remains stable, follow these steps meticulously: First, always consult the provided instruction manual. Assemble the bed in the exact order specified, ensuring all panels align correctly. Use only the tools recommended in the instructions to tighten all bolts, screws, and other connectors securely. Before assembly, check all packaging materials for any small parts that may have come loose during shipping. When attaching the panels to the frame, use the specified hardware and tighten them firmly, checking for any wobble. Never skip any assembly steps, as each is crucial for the bed's overall stability. After assembly, regularly check the connectors to ensure they remain tight. Retain your instruction manual for future reference or if adjustments are needed. By adhering to these guidelines, you can enjoy a safe and securely assembled Ashley B488-53 Twin Panel Bed.
118
Share

I need help setting up data logging on my AZ INSTRUMENT 7710 PM2.5 Monitor. Can you explain the process?

Absolutely! Setting up data logging on your AZ INSTRUMENT 7710 PM2.5 Monitor is straightforward. Here’s a step-by-step guide: Powering Up Your Device: Connect the device to a power source using a USB-C cable. You can use a PC, a 5VDC wall adapter, or a power bank. Allow the device to warm up for about 10 seconds after powering on. The monitor will begin measuring PM2.5, CO2 concentration, ambient temperature, and relative humidity after the warm-up period. For optimal logging, it's recommended to power the device for at least 30 minutes before starting data logging. Configuring Data Logging: Connect the monitor to your Windows computer via the USB port. The device is plug-and-play, meaning no special software installation is initially required. Your computer should recognize the logger as a CD-ROM. If it doesn't automatically prompt you, locate the recognized CD-ROM, which will be labeled "PDF Logger" in your file management system. Double-click the "Logger configuration tool" to configure the device. The configuration screen supports multiple languages for ease of use. You can adjust settings like the sampling rate, start delay time, and Logger ID. Sampling rate options range from 1 minute to 2 hours. Start delay time can be set from 0 minutes to 12 hours. The Logger ID is a 4-digit number to uniquely identify your device. After setting your preferred configurations, click "Save" to synchronize the settings with your computer's time zone. Close the setup screen and disconnect the logger from the computer. Position the logger in your desired location for monitoring indoor air quality. Starting Data Logging: To activate the logger, press and hold the "Start" key. The "REC" LED will flash, indicating that logging has begun. If you've programmed a start delay, the "REC" LED will remain steady for the set delay time before flashing. To stop recording before the memory is full, press and hold the "STOP" key until the "REC" LED turns off. The device can store up to 12000 records. If the memory is full, the display will show a "FULL" icon. Downloading Logged Data: Reconnect the device to your computer to download the recorded data. On the setup screen, click "Data Download" and select the destination folder for saving the log file. The downloaded data will be saved as a CSV report, which can be easily opened with Windows Excel. This report includes detailed information about the recorded data. By following these steps, you’ll be able to effectively use the data logging feature on your AZ INSTRUMENT 7710 PM2.5 Monitor, allowing you to monitor and analyze indoor air quality accurately.
102
Share

How do I install a Siemens MPI-2 Mounting Plate on a System 3 Rail Assembly for my TRI-S, TRI-D, or TRI-R devices?

Installing the Siemens MPI-2 Mounting Plate for your TRI-S, TRI-D, or TRI-R devices on a System 3 Rail Assembly is straightforward. Here's a step-by-step guide: Mounting Plate Installation: Use the four 8 x 1/4 Phillips head screws included to attach the MPI-2 plate to the System 3 Rail Assembly. Secure the screws at the upper and lower corners of the plate, referencing the positions labeled 'A' in the provided diagrams. Device Installation: Mount one or two TRI-S, TRI-D, or TRI-R modules onto the MPI-2 plate, as illustrated in the figure. Utilize four of the 8 x 1/4 Phillips head screws for each TRI module to firmly secure them to the mounting plate. Cover Plate Installation: Attach the BP-30 cover plate to the System 3 door to conceal the MPI-2 plate, providing a polished and professional finish. Additional Guidance: For detailed instructions on routing power-limited and non-power-limited wiring to ensure the proper operation of the devices, consult the System 3 Control Panel Installation Instructions (Part Number 315-093680).
104
Share
Cookie
Cookie Settings
© 2025 Servanan International Pte. Ltd.