
Scheduling the installation of your Schneider Electric AGS Automatic Generator with APC-UPS is a straightforward process. Here's how to do it:
Complete the AGS Info Form: Begin by filling out the AGS Info Form. Be sure to include all necessary details, such as your contact information, the specific service requirements for your generator and UPS system, the UPS model and serial number, and the warranty period.
Separate APC Global Service Order: Make sure that the APC Global Service Order is separate from your AGS Info Form.
Proof of Purchase: Have your proof of purchase readily available. If there is a difference of more than three months between the serial number's date and the purchase date, ensure you have the appropriate documentation.
Email the Order: Email the completed order form to APC Thailand at itdplanner@schneider-electric.com.
Specify Installation Date: Clearly state your preferred installation date within the order form.
Prepare the Installation Site: Ensure the installation site is fully prepared for the Field Service Engineer. This includes making sure the UPS unit is accessible for installation and having the power system ready as per the requirements.
Coordinate with the Installation Team: Contact the appropriate service center or installation team in your area to confirm the appointment and finalize all installation details.
Pre-Installation Check: Before the scheduled installation, review the Pre-Installation Checklist provided in your manual. This will ensure that all necessary requirements are met.
By carefully following these steps and providing all the requested information, you can ensure a smooth and efficient installation of your Schneider Electric AGS Automatic Generator with APC-UPS.


