Installing a Goodman BAYSPEK070 Single Point Entry Kit correctly ensures your unit operates safely and efficiently. Follow these steps for proper installation:
- Inspect for Damage: Before starting, carefully check the kit for any shipping damage. Report any issues to the carrier immediately.
- Power Supply Compatibility: Confirm that your power supply matches the specifications listed on the single power entry kit nameplate, heater, and the unit model itself.
- Electrical Codes: All field electrical connections and wiring must adhere to the National Electrical Code and any applicable local electrical codes.
- Mounting the SPEK:
- Remove the Control/Heat panel.
- Mount the SPEK below the Heater Controls using the provided screws.
- Route the unit power wires included with the SPEK through the Control box base and up to the unit contactor.
- Electrical Connections:
- Make all electrical connections to the unit and heater according to the wiring diagram provided with the SPEK.
- Place the SPEK wiring diagram inside the Control/Heater access panel, next to the unit wiring diagram.
- Nameplate Labels:
- Affix the two nameplate labels supplied with the single power entry kit to the air conditioning or heat pump unit, as shown in the manual.
- Use the smaller label to cover the unit's MCA and Fusing information.
- High Voltage Field Wiring:
- Ensure all field wires are rated for a minimum of 75°C.
- Connect the power supply to the terminal block on the SPEK and the ground wire to the ground lug.
- Reinstall the Control/Heat access panels and apply power.
- Low Voltage Wiring (24 Volts):
- All low-voltage connections are made to the heater via polarized plugs.
- Connect the low-voltage controls to the room thermostat, referring to the field wiring diagram.
By following these steps and consulting your user manual, you can successfully install the Goodman BAYSPEK070 Single Point Entry Kit.