
To ensure a safe and proper installation of your Schneider Electric AK5JB143 Linergy HK in a switchboard, follow these key guidelines:
Qualified Professionals Only: Always have the installation, operation, servicing, and of this electrical equipment performed by qualified personnel. Electrical safety is of utmost importance.
Switchboard Suitability: The provided instructions are specifically tailored for Schneider Electric switchboards. If you're installing the Linergy HK in a switchboard from a different manufacturer, the installer assumes full responsibility for the installation's compatibility and safety.
Technical Specifications: The Linergy HK is designed for circuits that can handle up to 18 kA rms Symmetrical Amperes and a maximum of 480V. Use only Class RK5 fuses, with a maximum rating of 225A.
Consult the Manual: Due to ongoing changes in standards and design, it's crucial to confirm all information in the manual before proceeding with the installation. The latest version of the manual will provide the most accurate guidance.
Eco-Conscious Design: Schneider Electric is committed to sustainability, as reflected in the use of ecological paper for the documentation.
Get in Touch: For any further questions or clarifications regarding the AK5JB143 Linergy HK or its installation, you can contact Schneider Electric Industries SAS or visit their website for additional support.


