Properly aligning the lock rods on your DIAMONDBACK CVR-2 Rear Loading ATV Carrier ensures secure and optimal performance. Here's a step-by-step guide:
- Adjust the Lock-Rod Guide Brackets: Using a 7/16” socket, unbolt and reposition one bolt on each lock-rod guide bracket to the second, unused slot. Do this for all four brackets on the cover.
- Loosen and Retighten Lock Rods: Use the provided hex key to loosen the set screws on both the tail and cab panel lock rods. Then, after confirming the correct orientation (handle closed and handle open positions), retighten each lock rod.
- Final Bracket Tightening: With the lock rods aligned in the closed position, tighten all brackets using the 7/16" socket. Simultaneously apply upward pressure on the bracket and downward pressure on the cover to achieve a tight seal. Repeat for all brackets.
- Allow for Weatherstrip Break-in: Initially, keep the panels closed as much as possible to allow the weatherstrips to settle. After a few days, the panels should operate smoothly.
- Cab Panel Safety Feature: Remember that the cab panel features a safety spring lock handle designed to engage the lock rods when closing the panel, preventing accidental opening during transport. By following these steps carefully, you will successfully install and optimize the DIAMONDBACK CVR-2 Rear Loading ATV Carrier, guaranteeing its functionality.