
To confirm your Edimax GS-1005BE switch is properly connected and functioning after installation, check the indicators on the device. Here's a guide to interpreting these lights: 1. PWR LED (Power): - Green (On): The switch is receiving power. - Off: The switch is not powered on. 2. LINK/ACT LED (Link/Activity): - Green (On): Indicates a 2.5G link speed. - Amber (On): Indicates a 100/1000M link speed. - Off: The port isn't connected or there's a link issue. - Flashing: Data is being transmitted. To ensure proper connectivity and operation: Make sure the PWR LED is green, meaning the switch is powered. Check that the LINK/ACT LED for each connected port (to your devices or router) is either green or amber, signaling the link speed. If any LED is off, examine the cable connections and device setups to resolve potential connection issues. For more detailed information, consult the hardware overview section in the Edimax GS-1005BE manual.


