What procedures are required to install a charging pile?
2 Answers
After the user officially signs the car purchase contract, they can entrust the car manufacturer or 4S store to submit a power installation application to the power supply company. The power supply company will formally reply with a power supply plan within 7 working days, after which the user needs to go to the power supply company to complete the confirmation procedures. The power company will arrange an on-site inspection and generally notify the owner within three working days. The function of a charging pile is similar to that of a fuel dispenser in a gas station. It can be fixed on the ground or wall and installed in public buildings (such as public buildings, shopping malls, public parking lots, etc.) and residential parking lots or charging stations. It can charge various types of electric vehicles according to different voltage levels. The following is the process for installing a charging pile: Worker installation and construction: During the inspection process, the owner must fully communicate with the engineer to select the best solution. After the user officially obtains confirmation of the power supply plan, the electric vehicle manufacturer or 4S store will carry out the construction. The equipment selection must comply with national requirements. After the project is accepted, relevant procedures will be completed. The power supply company will complete the installation and connection of the electric meter within 5 working days. For the subsequent use of the charging pile, the owner cannot use the charging pile for commercial operation because the electricity cost for new energy vehicles is calculated based on the basic electricity rate. User acceptance application: After the construction of the charging pile is completed, the user needs to submit an acceptance application to the power supply company in the project acceptance area.
I recently installed a home charging station. The first step was obtaining written approval from the property management—it's best to discuss this early to avoid delays. Then, I submitted an application to the power company for capacity expansion, requiring forms detailing the location and load, followed by their site inspection. After approval, I hired an installation company; the process took about a day or two. During final inspection, I checked insulation and safety labels. I faced hesitation from the property management but convinced them by explaining EVs' cost savings and environmental benefits. Post-installation, don't forget regular checks for socket and wiring wear to ensure safe, worry-free use. The entire process took weeks, but daily charging is now much easier. Plan your budget and location ahead—avoid balconies or garage corners to prevent safety risks.