What is the installation process for new energy vehicle charging piles?
2 Answers
New energy vehicle charging pile installation requires first applying for the installation method. Installation process: Contact the property management company to confirm the community's charging pile installation policy, inspect your parking space to understand if the community meets installation conditions, provide relevant materials, have third-party installers conduct on-site inspection, apply for charging pile installation method, and submit electricity application. Precautions: Determine if you have a private parking space, whether the property management agrees to install a private pile, what materials need to be prepared and submitted to the property management, address wiring issues, ensure voltage meets requirements, apply for a new electricity meter specifically for measuring charging facility usage, which is separately metered from residential household electricity.
I've experienced the process of installing a charging station! First, you need to contact the property management or power supply bureau for approval—they'll review your parking space and electrical circuit diagram. Once you get the permit, schedule an appointment with a certified installation company. The engineer will first survey the location to confirm the distance between the meter and the parking spot isn't too far, preferably choosing a covered area to prevent rain exposure. Next comes the electrical test to check if your home wiring needs an upgrade—older circuits may trip easily. The installation involves laying dedicated cables and mounting the charging station box, which is labor-intensive. The whole process usually takes about two weeks. Don’t forget about the costs: the station itself costs around 1,000–2,000 RMB, while installation and materials may add up to roughly 3,000 RMB. After installation, test the charging speed and report any issues promptly. In short, don’t rush to start charging—safety first!