What is the installation method for Chery new energy vehicle charging piles?
1 Answers
Chery new energy vehicle charging pile installation method involves checking the route, grounding the wire, and installing the charging pile. Precautions for installing charging piles: Apply to the property management for confirmation, understand the community's charging pile installation policy, and inspect the installation environment of the community charging pile. Communities generally have power distribution rooms, and the distance between the parking space and the power distribution room will be a decisive factor in cost control. The closer the distance, the lower the cost. Prepare materials and apply to the power company. After receiving the application, the power company will conduct an on-site inspection. Installation method for car charging piles: Generally, after purchasing an electric vehicle, the owner will have the charging pile manufacturer submit the installation materials to the power supply company. Required documents include a copy of the user's ID card, the new energy passenger car charging condition confirmation letter, property management's installation approval, and parking space proof. After the manufacturer finalizes the construction plan, the installation process begins. Depending on the conditions of each community and the location of the garage, the construction time varies. Some installations may only take 2 hours, while others may require a full day to complete.