What are the requirements for installing a charging pile?
1 Answers
Automobile charging pile installation requirements include: consent from the residential property management and having a fixed parking space within the community. Steps for installing an automobile charging pile: Step 1: Apply for confirmation from the property management. Understand the community's charging pile installation policy, inspect the installation environment, and if additional technical equipment is required, apply to the community in advance. Generally, a fixed parking space is needed. Step 2: Determine the location of the parking space. Most communities have a power distribution room, and the distance between the parking space and the distribution room becomes a decisive factor in cost control—the closer the distance, the lower the cost. Step 3: Prepare materials and apply to the power company. Required materials include: a copy of the ID card, proof of parking space ownership, and an installation agreement signed by the property owner. Step 4: Inspection and installation. After receiving the application, the power company will conduct an on-site inspection, requiring the presence of the property engineer, charging pile company, power company, and the owner to finalize the construction plan. Depending on the distance between the parking space and the distribution room, the construction time varies, ranging from a few hours to a day. Step 5: Acceptance. After completion, the charging pile company needs to report to the power company. Upon passing the power company's inspection, they will stamp the approval and issue the corresponding electricity card.