What are the installation instructions for the Great Wall Ora R1 charging station?
4 Answers
The following are the installation instructions for the Great Wall Ora R1 charging station: 1. Classification: Charging stations are generally divided into two types based on ownership: public stations and private stations. Public stations are universal but charge electricity and service fees, resulting in higher costs; private stations are only suitable for personal vehicle use and lack universality. 2. Applicability: When using public charging stations, ensure they are suitable for large or small vehicles, as some older standard stations may not charge small vehicles, and vice versa. 3. Inspection: Before charging, check that the charging station equipment is intact, with undamaged cables and connectors. Avoid using outdoor charging stations without a canopy on rainy days to prevent electric leakage hazards. After charging, promptly disconnect the charging station to prevent overcharging.
I just installed a charging pile for my Great Wall Ora R1, and the whole process was straightforward. First, I contacted the power company to apply for a dedicated 220-volt meter, which required filling out an application form. They came to install the electrical box within a day or two. Then, I chose the charging pile—I went with the manufacturer-recommended 7 kW slow-charging version, which cost about 2,000 RMB at the 4S store. The property management had to provide written consent, so I made sure to coordinate with them in advance to avoid delays. After that, I hired a licensed electrician who ensured proper grounding during the wiring installation, avoiding the use of regular sockets to prevent overloading. Post-installation, I tested the voltage and charging function. Now, plugging it in for a few hours each night fully charges the car, which is quite hassle-free. Remember to leave enough space for the charging pile to make parking and charging convenient.
Safety comes first when installing the Ora R1 charging pile. I prioritized assessing my home's circuit load to prevent overloading and chose a pile with automatic power-off protection. Don't skip the power application process—designate a dedicated circuit to avoid interference. Hire a professional electrician to check wiring, insulation, and grounding standards, preventing leakage risks. The whole process took some time for approval, but patience pays off. After charging, the vehicle showed a quick and stable full charge. Regular maintenance is recommended to extend the pile's lifespan. Don't forget to communicate with property management in advance to avoid disputes later.
Installing the charging pile for my Great Wall Ora R1 was super easy. I called the power hotline to apply for a free meter, and they sent someone quickly. Getting the property management's stamp went smoothly—I just sent a WeChat message in advance to clarify everything. I bought the manufacturer's 7kW charging pile at a moderate price. Hired a local electrician to install it, and it was done in half a day with all the wiring connected and tested properly. Now charging is convenient, taking just a few hours, and the car always shows a full battery. The whole process was stress-free and effortless.