Should the Little Ant EV be plugged in first or powered on first when charging?
1 Answers
The Little Ant EV should be plugged in first and then powered on. Little Ant charging power: Models before the 2019 version have a charger power of 3.5kW, while the 2019 Little Ant has a charger power of 6.6kW. Little Ant: The Little Ant is an all-aluminum pure electric car that combines aesthetics, range, handling, smart features, and safety services. Exterior-wise, the car body comes in seven colors: Vitamin C Yellow, Rouge Red, Gud White, Cool Gray, Sakura Pink, Joy Green, and Light Cyan, paired with five interior colors: Mint Green, Sunshine Orange, Sakura Pink, Lychee White, and Lemon Yellow. In terms of range, the Little Ant offers three charging methods for greater flexibility, and it comes with an onboard charging cable for convenient charging anytime.