Is grounding wire necessary for BYD charging?
1 Answers
BYD Yuan must use a grounded socket when using the portable charger that comes with the vehicle. BYD Yuan can also be charged using charging piles. Method for charging with charging piles: Locate the electric vehicle charging port, then insert the plug from the charging gun into the charging port of the electric vehicle. Click 'Start Charging' and ensure the connection between the charging pile and the electric vehicle is successful, then click the 'Start Charging' button on the screen. Select the appropriate charging method and click the corresponding button on the screen; it is recommended to choose the automatic full charge method. Place the magnetic card on the sensing area, and the system will automatically read the card data and initiate the charging process to start charging. After charging is completed, click the 'End Charging' button, swipe the card to complete the payment settlement, then the charging process will shut down and the charging gun can be retrieved. Features of charging with charging piles: The input end of the charging pile is directly connected to the AC power grid, and the output end is equipped with a charging plug for charging electric vehicles. Charging piles generally provide two charging methods: regular charging and fast charging. Specific charging cards can be used to swipe on the human-machine interaction interface provided by the charging pile to perform corresponding operations such as selecting charging methods, charging time, and printing fee data.