How to Remove the Gear Knob of Baojun 310?
1 Answers
After opening the hood, remove the engine cover to provide more space for subsequent operations. Disconnect the fixed pipelines on the engine. Remove the screws securing the pipelines on the transmission. There are two fixing points on the turbocharged pipeline, with the lower one located on the transmission, which can be removed using a 13mm socket. The gear linkage ball joint is secured by a clip. Simply press the clip in the middle of the ball joint inward and pull outward to separate the linkage from the ball joint on the small cover.