···
Log in / Register

How to Install the Timing Belt on a Peugeot 1.2T Engine?

4 Answers
DiAiden
07/29/25 3:35pm
Installation method for the Peugeot 1.2T timing belt: 1. Align the timing mark on the camshaft timing gear with the mark on the valve cover. 2. Align the timing mark on the crankshaft timing gear with the mark on the front cover. 3. Install all components of the timing belt in sequence. 4. Loosen the pulley mounting bolts by 1/4-1/2 turns, compress the automatic tensioner pushrod to the lowest position, insert a steel pin into the hole, adjust the pulley with a snap ring pliers, rotate counterclockwise until the pulley adjustment hole is parallel to the ground, tighten the fixing bolts, and remove the steel pin. 5. Rotate the crankshaft clockwise for 2 turns and check if the timing marks are correctly aligned. 6. Reinstall the engine timing belt cover. 7. Reinstall the generator and air conditioning compressor belt.
Was this review help?
16
0
Share
MacAlex
08/14/25 9:18am
Last time I replaced the timing belt on my Peugeot 1.2T, the whole process was quite mentally taxing. First, I let the engine cool down completely, then disconnected the battery's negative terminal to prevent electric shock and drained the coolant to reduce leakage risks. Next, I removed the front engine cover and auxiliary drive belt to expose the timing system. The crucial step was aligning the crankshaft and camshaft positions - I used a specialized camshaft locking pin tool to secure the shafts, ensuring precise gear marking alignment. When removing the old belt, I checked its wear condition and found severe aging. Installing the new belt required extreme care, starting from the bottom pulley teeth and slowly threading it on to ensure each tooth groove fit perfectly without gaps. The tension adjustment was the most troublesome part, requiring precise measurement with a tension gauge - too tight would strain bearings, too loose would cause slippage. After installation, I reassembled all components and ran the engine for several minutes for testing - no abnormal noises meant success. This DIY project took me over half a day, demanding high concentration and professional tools. While it saved labor costs, the risks were considerable.
Was this review help?
16
5
Share
Expand All
OReagan
10/12/25 2:42am
Installing a timing belt is no trivial matter, especially for engines like the Peugeot 1.2T, which have a precise structure where even a slight misalignment can cause the engine to seize and become irreparable. I've studied the manual myself and observed technicians at work—the process involves locking the camshaft with specialized tools, aligning the crankshaft marks, and adjusting the tension after fitting the new belt. However, unexpected issues often arise during actual operation, such as loose screws or inadequate tools, which can easily lead to mistakes. I recommend avoiding DIY attempts and instead visiting an authorized 4S shop. They have original tools and trained professionals who can complete the job quickly and offer a warranty. If you attempt it yourself and fail, the repair costs can skyrocket to tens of thousands, outweighing any potential savings. Peugeot's timing systems are prone to issues, so regular inspections and replacements every 60,000 to 80,000 kilometers are crucial—don't delay. Safety comes first; opting for professional service is the wisest choice, saving both time and effort.
Was this review help?
16
4
Share
Expand All
OFelicity
11/25/25 3:45am
Here’s a brief guide on replacing the timing belt: First, let the engine cool and disconnect the battery. Remove the cover and auxiliary belt to expose the timing wheels. Secure the camshaft position and rotate the crankshaft to the alignment mark. Remove the old belt and clean the gear teeth. Install the new belt, ensuring it sits flat and aligns with each gear, then adjust the tensioner to the proper tension. Manually rotate the engine a few turns to test smoothness. Finally, reassemble all components and start the engine to confirm no unusual noises, indicating success. Essential tools like alignment pins are crucial to prevent wheel misalignment during the process. The entire procedure takes about two hours, with careful attention to critical steps.
Was this review help?
11
0
Share
Expand All
More Forum Discussions

How to Transfer Vehicle Registration Across Different Locations?

After finalizing the vehicle purchase, proceed to the used car trading market at the vehicle's current location to complete the transaction. Remember to apply for temporary license plates during the registration transfer process to facilitate driving the vehicle back. Upon completion of the vehicle purchase transaction, don't forget to also transfer the vehicle insurance.
7
1
Share

How to Use Front Parking Sensors?

Front parking sensors come with an on/off switch. They can be turned off when not in use. Front parking sensors can detect obstacles below the bumper that are difficult for the driver to see from inside the vehicle. The front sensor probes are installed on the front bumper. The probes radiate at approximately a 45-degree angle to search for targets in all directions (up, down, left, and right).
4
0
Share

What should be noted when charging an electric vehicle battery for the first time?

During the first charge, it is essential to use the original charger and start charging when the remaining battery level reaches 30%. The charging time for the first charge can be between 8 to 10 hours, with the maximum charging time not exceeding 12 hours to avoid damaging the battery. Below is relevant information: 1. Pure Electric Vehicles: Pure electric vehicles refer to vehicles powered by an onboard power source, using electric motors to drive the wheels, meeting all requirements of road traffic and safety regulations. Due to their relatively smaller environmental impact compared to traditional vehicles, their prospects are widely optimistic, although current technology is not yet mature. 2. Composition: The composition of electric vehicles includes the electric drive and control system, mechanical systems such as drive force transmission, and working devices to complete set tasks. The electric drive and control system is the core of an electric vehicle and the most significant difference from internal combustion engine vehicles. The electric drive and control system consists of the drive motor, power source, and motor speed control device, among others. Other components of electric vehicles are essentially the same as those of internal combustion engine vehicles.
20
4
Share

How to Quickly Find a Lost Car?

If your car is lost, you should report it to the police immediately and let the public security department handle the search. Provide the police with evidence such as the car's license plate number, model, color, style, and last parking location to assist in the search. If the vehicle is covered by theft insurance, file a claim as soon as possible to minimize financial losses. If the entire vehicle is not recovered within three months of being stolen, the insurance company will compensate based on the actual value of the vehicle at the time of the incident, according to the policy terms.
3
2
Share

How to Check If a Driver's License Has Expired?

First, download the Traffic Management 12123 APP. Register an account using your driver's license number. After logging into Traffic Management 12123 with your account, there will be a 'Driver's License Function'. Click on the Driver's License Function, enter your driver's license number, and a page will appear as follows. This page will display information such as pending tasks, overdue status, expiration date of the driver's license, renewal upon expiration, renewal due to age, driver's license review, and physical condition certification.
19
2
Share

How to Handle Inspection Business on the Traffic Management 12123 App?

First, open the Traffic Management 12123 app. Click on "More" on the right side of the main interface. Navigate to the business center interface and click on "Inspection Education Application" at the bottom. Review the conditions for the inspection education application, check the agreement, and click "Next." On the inspection education application interface, select the education method and city, then click "Next." On the next interface, choose the date for the education session and click "Next." Finally, verify the information and click "Submit Application" at the bottom to complete the process.
18
4
Share
Cookie
Cookie Settings
© 2025 Servanan International Pte. Ltd.