How to install the running boards on Baojun 530?
1 Answers
Steps to install running boards on Baojun 530: 1. Locate the mounting bracket holes on the vehicle chassis; 2. Secure the brackets with screws; 3. After fixing the brackets, loosen the nuts on the back of the running boards; 4. Place the running boards on the brackets, align the studs on the boards with the holes on the brackets, and adjust the position of the running boards; 5. Once the running boards are properly adjusted, tighten all the screws. The Baojun 530 has a body length, width, and height of 4690mm, 1835mm, and 1750mm respectively, with a wheelbase of 2750mm. The vehicle is equipped with an engine that delivers a maximum power of 108kw and a maximum torque of 250nm.