How to Install the Leapmotor T03 Charging Station?
1 Answers
After purchasing the car, the charging pile manufacturer submits installation materials to the power supply company, which requires providing copies of the user's ID card and other documents. Once the manufacturer finalizes the construction plan, the construction time varies depending on the conditions of each residential area and the location of the garage. The power company conducts an on-site inspection. Upon passing the inspection, they will seal the meter, and the power company will then issue a corresponding electricity card, which will be collected by the charging pile company and handed over to the owner.