How many kilowatt-hours does a BYD Song need for a full charge?
2 Answers
BYD Song requires approximately 18 kilowatt-hours for a full charge. Here is an extended introduction: 1. Powertrain of BYD Song: The BYD Song is equipped with a hybrid system consisting of a 1.5T engine and two electric motors, with one motor located at the front axle and the other at the rear axle, enabling four-wheel drive functionality. Additionally, the BYD Song has a pure electric range of 70km and can accelerate from 0-100km/h in 4.9 seconds. 2. Interior of BYD Song: The interior of the BYD Song features some diagonal line designs and chrome accents, creating a dynamic atmosphere. The steering wheel bears a red 'Song' emblem at the bottom, highlighting the car's identity.
The BYD Song DM-i typically has a battery capacity of around 18.3 kWh, and a full charge consumes approximately 18 kWh. I remember when I used the car, after a full charge, it could travel 60-80 km on pure electric power, which was especially convenient. When charging, using a fast-charging station takes about 40 minutes to go from 20% to full, but using a household socket for slow charging takes around seven to eight hours. I usually plug it in at night and wake up to a fully charged car the next morning. In winter or extremely hot weather, the car consumes a bit more electricity due to reduced battery efficiency, but overall, it’s very cost-effective. For city driving, I typically charge it twice a week, which is enough, eliminating the need for frequent refueling—saving money and being eco-friendly. During maintenance, the 4S shop recommends regular checks on the charging system to avoid potential leakage risks. Overall, the battery design is very practical, suitable for daily commutes and short trips.