How many days does it take to replace a bumper at a 4S shop?
1 Answers
Replacing a car bumper at a 4S shop takes 3 to 4 days. The main function of the front and rear bumpers is to absorb external impact: The main function of the front and rear bumpers is to absorb external impact, effectively protecting the vehicle body and serving as a safety device for passengers. When vehicles were first introduced, bumpers were primarily made of metal. With the continuous development of the automotive industry, bumpers have been replaced with plastic materials, which serve to protect both the vehicle and pedestrians. Specific time for bumper replacement: Replacing a car bumper at a 4S shop takes 3 to 4 days. The process involves painting the bumper, which can be completed on the same day. However, it then requires 2 to 3 days for the paint to fully dry before the vehicle can be used normally. In winter, this period may be extended by 1 to 2 days.