How Many Days After New Energy Vehicle Information Confirmation to Get License Plate?
2 Answers
New energy vehicles can get license plates 7 days after information confirmation. Below is an introduction to new energy vehicles: New energy vehicles refer to vehicles that use unconventional vehicle fuels as power sources (or use conventional vehicle fuels with new on-board power devices), integrating advanced technologies in vehicle power control and driving, resulting in technically advanced vehicles with new technologies and structures. Classification: New energy vehicles include four major types: hybrid electric vehicles (HEV), battery electric vehicles (BEV, including solar-powered vehicles), fuel cell electric vehicles (FCEV), and other new energy vehicles (such as those using supercapacitors, flywheels, and other high-efficiency energy storage devices).
When I first got my new energy vehicle, I only waited two days after confirming the information before getting it licensed. The process was super smooth: submitted documents on Monday, notified for vehicle inspection on Tuesday, and received the license plate on Wednesday. There are many influencing factors, such as whether the documents are complete and how busy the local DMV is. Shenzhen has a fast track for new energy vehicles, averaging 2-3 working days to complete. It's recommended to photocopy the invoice and ID card in advance, and delegating the dealer to handle it saves more time. Don't drive on the road before getting the license plate, safety first. New energy policies offer great advantages, with fast licensing and exemption from purchase tax, so consult more when buying a car. During peak queuing times or in small cities, it might take up to 5 days, but daily waiting times aren't too long. Every time I pass a gas station, I feel this car is worry-free and saves money.