How Long Does It Take to Replace a Clutch Plate?
2 Answers
Replacing a clutch plate typically takes about three to four hours. A clutch plate is a composite material primarily designed for friction, while also meeting structural performance requirements. Friction materials are mainly used in the production of brake pads and clutch plates. These friction materials primarily utilize asbestos-based friction materials. With increasing environmental and safety requirements, semi-metallic friction materials, composite fiber friction materials, and ceramic fiber friction materials have gradually emerged. Below is the manufacturing process of clutch plates: 1. Using the calendering and rubberizing process. Process flow overview: Non-asbestos fiber threads are first impregnated in resin, then in rubber paste. After drying, the non-asbestos fiber threads are calendered and rubberized, formed into strips, wound, and then hot-pressed into shape, followed by further heat treatment. They are then ground, dusted, and labeled. Finally, they undergo inspection and packaging. 2. Using the impregnation and drying tower process. Process flow overview: Non-asbestos fiber threads are first impregnated in resin and rubber paste and then dried. They are then wound, hot-pressed into shape, and undergo further heat treatment. After grinding, dusting, and labeling, they are inspected and packaged.
I've handled clutch plate replacements many times during my auto repair career. It typically takes 2 to 4 hours in a professional workshop, depending on the vehicle model. Front-wheel drive cars have more complex structures, requiring removal of fenders, drive shafts, and exhaust pipes first, which takes longer than rear-wheel drive vehicles. A skilled technician can complete the entire process in one go: removing the transmission, installing new plates, checking flywheel flatness, reassembling, adding new oil, and testing. However, if severe wear is found on old parts or other issues like bearing damage are discovered, additional repair time will be needed. I recommend preparing all parts and tools in advance and choosing a reliable shop to avoid schedule delays. For DIY beginners, it's best to reserve an entire weekend to prevent mid-process complications from causing disruptions.