Browse
···
Log in / Register

Senior Project Manager - Data Center Construction

$110,000-150,000/year

Path Construction

Chicago, IL, USA

Favourites
Share

Description

Path Construction seeks a qualified Senior Project Manager to join our organization in the Chicago, IL area. We are a rapidly growing commercial general contractor with offices in Arlington Heights, IL; Charlotte, NC; Knoxville, TN; Tampa, FL; Dallas, TX; and Phoenix, AZ with projects throughout he country. The right candidate will have 7 years of project management experience in Data Center construction. Path is looking for people with great technical skills, good communication skills, and a strong attention to detail. Duties for Senior Project Managers include: Leading and managing a project team in building successful projects, cost control for full P+L responsibility, managing day-to-day activities of subcontractors and suppliers, contract administration, procurement, estimating, pay requests, change orders, requests for information, cost control, scheduling, tracking submittals, safety controls, maintaining and delivering a high level of quality. About the Company Founded in 2008, Path Construction is a general contractor providing a vast array of construction services to multiple regions throughout the country. Our expertise is very diverse and includes experience on small and large projects of many different types, including but not limited to: healthcare, hospitality, higher education, multi-family, self-storage, senior living, transportation, water and waste treatment, convention centers, laboratories, and correctional. The main philosophy and strategy for the growth of our organization is to be on the cutting edge of all aspects of the construction process. Additionally, our unmatched customer satisfaction and, most importantly, the development and quality of our people drive our success. For more about us, please visit our website at www.pathcc.com. Requirements • Bachelor's degree in Engineering, Construction, or Architecture • 7+ years construction experience including Data Centers • Primavera/Microsoft Project scheduling experience • Occasional travel (1-3 days per month) • Estimating experience is a plus • Proficient in Microsoft Office Benefits Annual Salary Range: $110,000 - $150,000 401(k) Program Health, Dental, Vision, Life, Long-Term and Short-Term Disability Insurance Company cellphone and computer Annual Bonus Plan

Source:  workable View original post

Location
Chicago, IL, USA
Show map

workable

You may also like

Workable
Construction Scaffolding Labor AZ - Professional Sporting Events
InProduction is the leading provider of temporary seating, staging, structures, and scenic production for the U.S. live events industry. The Company is a valuable partner to event organizers throughout the entire venue transformation process, with core services including design and fabrication, delivery and installation, on-site execution, and tear down. These services span a variety of end verticals including golf, motorsports, music festivals, other sports & entertainment, and corporate events. InProduction maintains a total commitment to excellence for an exceptional outcome at every event. The Company is backed by ZMC. ZMC is a leading private equity firm comprised of experienced investors and executives who invest in, and manage, a diverse group of media and communications enterprises. Founded in 2001, ZMC’s investment philosophy centers on operational value creation driven by targeted investment themes, deep sector expertise, and strong partnerships with industry and operating executives. ZMC approaches its investments in collaboration with management teams and has a successful track record of actively adding value to portfolio companies. Come join us! Check out our web page https://www.inproduction.com/ As a Professional Sports Scaffolding Laborer at InProduction, here is what you can expect: Daily Routine of scaffolding structures at some fascinating professional venues like football and soccer stadiums, baseball fields, tennis courts, golf courses, hockey rinks, and racetracks for example. You can expect to see much of the work we completed while watching a game or event on tv. Crews which you will be assigned to will be no more than 5 employees and will travel from job to job together as a crew. Full Time, Consistent and Year-Round Work without having to wonder when or if the next assignment is coming. Work Environment is generally outdoors so you will be in the sun and fresh air while building. Overnight Travel will be the routine and you can be away from home for 90+ days at a time. Travel Accommodations and hotel lodging will be arranged and provided by InProduction. We stay two crew members to a room. Hotel rooms will usually have small kitchens so you can prepare meals. Benefits are available to you and your eligible family members such as medical insurance, dental insurance, vision insurance. When eligible you will have paid vacation, paid holidays, and great opportunity for weekly overtime.· Growth and Opportunity to grow your construction skills which may provide an opportunity to become a Crew Lead, a Foreman, Project Manager, or wherever else it leads you. Additional Duties and Responsibilities: Build and breakdown scaffolds, install ladders, walkways and handrails Assist in the safe and efficient installation/removal of equipment in accordance with project specific plans and layouts Inspecting all scaffold components prior to assembly Clean and prepare construction sites, including removing debris and materials Load and unload equipment and materials form truck and vehicles Study plans and equipment lists prior to on-site installation Ensure appropriate safety measures are followed; including wearing and use of safety equipment Maintain fall protection requirements while erecting / dismantling scaffolds Make sure that tools and equipment are cleaned and maintained properly at the end of each shift Ensure full client satisfaction in relation to the quality of service and finished product within planned time schedules Other duties as required Requirements Background Check and Drug screening required Valid driver's license preferred, with good driving record. Familiar with basic hand tools, drills, saws, hammers, etc. Cannot be afraid of heights Creative problem solver with the ability to handle multiple tasks simultaneously Ability to work both independently and within a team setting to achieve company goals Able to lift-up to 75Ibs Candidate should be able read and understand basic safety instructions Candidates from a Scaffolding, Carpentry, Construction, Laboring or Events background are preferred. Must be capable of working overtime Preferred but not required: Bi-lingual (English/ Spanish) Benefits Medical, Dental, and Vision Insurance 401K Match Paid Holidays Paid Vacation Per-Diem
Tucson, AZ, USA
Negotiable Salary
Workable
Construction Scaffolding Labor AZ - Professional Sporting Events
InProduction is the leading provider of temporary seating, staging, structures, and scenic production for the U.S. live events industry. The Company is a valuable partner to event organizers throughout the entire venue transformation process, with core services including design and fabrication, delivery and installation, on-site execution, and tear down. These services span a variety of end verticals including golf, motorsports, music festivals, other sports & entertainment, and corporate events. InProduction maintains a total commitment to excellence for an exceptional outcome at every event. The Company is backed by ZMC. ZMC is a leading private equity firm comprised of experienced investors and executives who invest in, and manage, a diverse group of media and communications enterprises. Founded in 2001, ZMC’s investment philosophy centers on operational value creation driven by targeted investment themes, deep sector expertise, and strong partnerships with industry and operating executives. ZMC approaches its investments in collaboration with management teams and has a successful track record of actively adding value to portfolio companies. Come join us! Check out our web page https://www.inproduction.com/ As a Professional Sports Scaffolding Laborer at InProduction, here is what you can expect: Daily Routine of scaffolding structures at some fascinating professional venues like football and soccer stadiums, baseball fields, tennis courts, golf courses, hockey rinks, and racetracks for example. You can expect to see much of the work we completed while watching a game or event on tv. Crews which you will be assigned to will be no more than 5 employees and will travel from job to job together as a crew. Full Time, Consistent and Year-Round Work without having to wonder when or if the next assignment is coming. Work Environment is generally outdoors so you will be in the sun and fresh air while building. Overnight Travel will be the routine and you can be away from home for 90+ days at a time. Travel Accommodations and hotel lodging will be arranged and provided by InProduction. We stay two crew members to a room. Hotel rooms will usually have small kitchens so you can prepare meals. Benefits are available to you and your eligible family members such as medical insurance, dental insurance, vision insurance. When eligible you will have paid vacation, paid holidays, and great opportunity for weekly overtime.· Growth and Opportunity to grow your construction skills which may provide an opportunity to become a Crew Lead, a Foreman, Project Manager, or wherever else it leads you. Additional Duties and Responsibilities: Build and breakdown scaffolds, install ladders, walkways and handrails Assist in the safe and efficient installation/removal of equipment in accordance with project specific plans and layouts Inspecting all scaffold components prior to assembly Clean and prepare construction sites, including removing debris and materials Load and unload equipment and materials form truck and vehicles Study plans and equipment lists prior to on-site installation Ensure appropriate safety measures are followed; including wearing and use of safety equipment Maintain fall protection requirements while erecting / dismantling scaffolds Make sure that tools and equipment are cleaned and maintained properly at the end of each shift Ensure full client satisfaction in relation to the quality of service and finished product within planned time schedules Other duties as required Requirements Background Check and Drug screening required Valid driver's license preferred, with good driving record. Familiar with basic hand tools, drills, saws, hammers, etc. Cannot be afraid of heights Creative problem solver with the ability to handle multiple tasks simultaneously Ability to work both independently and within a team setting to achieve company goals Able to lift-up to 75Ibs Candidate should be able read and understand basic safety instructions Candidates from a Scaffolding, Carpentry, Construction, Laboring or Events background are preferred. Must be capable of working overtime Preferred but not required: Bi-lingual (English/ Spanish) Benefits Medical, Dental, and Vision Insurance 401K Match Paid Holidays Paid Vacation Per-Diem
Goodyear, AZ, USA
Negotiable Salary
Workable
Graduate Surveyor (SIT)
We are seeking a Graduate Surveyor to join our team! This position will assist Professional Surveyors with CAD production, boundary analysis, research, legal description and easement preparation, deliverables review, computations, and adherence to specific state statutes. This position will work under the responsible charge of a Professional Land Surveyor. Responsibilities: • Assists Project Surveyors and Project Leads with CAD production, boundary analysis, research, legal description and easement preparation, deliverables review, computations, adherence to specific state statutes, and other survey-related responsibilities. • Works with the Professional Land Surveyor to define project tasks, schedule, and resource requirements. • Works with Professional Land Surveyors to evaluate property boundaries in metes and bounds and public land survey states. • Travels occasionally for courthouse research and field crew support. • Coordinates with field crews and office staff. • Performs self and peer review QA/QC checks. • Stays current on service-specific trends, technology, software, hardware, and equipment. • Ensures division, regional, and company policies and practices are consistently followed within the survey service. • Leads by example – displays solid judgment, good values, trust, honesty, openness, and professionalism. • Provides day-to-day guidance and mentoring to project team staff as needed. • Handles multiple priorities and projects well. • Consistently exercises independent judgment and demonstrates critical thinking skills. Requirements • Surveyor-in-Training certification. • Minimum two-year Surveying degree required, four-year degree preferred. • Three-plus years of land survey field experience preferred. • Effective verbal and written communication skills are essential. Benefits • Medical Insurance • Employee Assistance Program (EAP) • Dental Insurance • Vision Insurance • Health Savings Account (HSA) • Flexible Spending Account (FSA) • Life Insurance and AD&D • Voluntary Life and AD&D • Short-Term Disability • Long-Term Disability • Accident • Critical Illness/Optional Cancer • LifeLock Identity Theft Protection w/Norton Cyber Security • Pet Insurance • 401(k)
Scottsdale, AZ, USA
Negotiable Salary
Workable
Assistant Project Manager - Construction
Path Construction is seeking a qualified Assistant Project Manager to join our organization in the Chicagoland area. We are a rapidly growing general contractor headquartered in Arlington Heights, IL with offices and projects throughout the United States. Typical duties of an APM include managing day-to-day activities of subcontractors and suppliers, contract administration, procurement, estimating, pay requests, change orders, requests for information, cost control, scheduling, tracking submittals, maintaining and delivering a high level of quality. The right candidate will have 2+ years of construction management experience on large and/or small projects and varying asset classes including but not limited to, Higher Education, Retail, Multi-family, Self-storage, Hospitality, Senior Living, Healthcare, Restaurant, Transportation, Water and Waste Treatment, Convention Centers, Laboratories, Correctional, etc. Path is looking for people with great technical skills, good communication skills, and strong attention to detail. Founded in 2008, Path Construction is a general contractor providing a vast array of construction services to multiple regions throughout the country. Our expertise is very diverse and includes experience on small and large projects of many different types, including but not limited to: healthcare, hospitality, higher education, multi-family, self-storage, senior living, transportation, water and waste treatment, convention centers, laboratories, and correctional. The main philosophy and strategy for the growth of our organization is to be on the cutting edge of all aspects of the construction process. Additionally, our unmatched customer satisfaction and, most importantly, the development and quality of our people drive our success. For more about us, please visit our website at www.pathcc.com. Duties for an Assistant Project Manager include: General Contract and Subcontract administration Monitor and document jobsite safety and accident prevention Construction Scheduling Material & Equipment – procurement and expediting Process RFI’s Receive Review Submit Log Shop drawing and submittal review and coordination Project cost review, reporting, updating and accounting Review of subcontractor applications for payment Participation in and documentation of project coordination meetings Supervision and coordination of subcontractors’ field installations Review and negotiate change proposal pricing from subcontractors Prepare change proposals Change order documentation and associated cost reporting and maintenance Research and suggest options on construction means, methods and equipment Quality control Project Closeout Implement all applicable Safety Programs and EEO/Affirmative Action Programs on the Project Requirements A 4 year degree in Building Contruction, Engineering, or a related field 2+ years of building and construction management experience OSHA Site Safety Experience Up-to-date with modern technology and display excellent communication skills General knowledge of construction principles/practices required Strong work ethic and desire to work in a team environment and grow the company Must have a valid driver’s license and ability to travel may be required Working knowledge of project management process and software. (Microsoft Office and SAGE 300 CRE) Proficient in Microsoft Office Preferred Public work experience is a plus Estimating experience is a plus Self Perform experience is a plus OSHA 30 Hour Training LEED Project Experience Benefits Annual Salary Range: $60,000 - $100,000 Certification Training 401(k) Program Health, Dental, Vision, Life, Long-Term and Short-Term Disability Insurance Company cellphone and computer Annual Bonus Plan
Arlington Heights, IL, USA
$60,000-100,000/year
Workable
Project Manager (Binghamton, NY)
We are currently seeking qualified candidates for a Project Manager - in LaBella’s Program Management Services Division at our client’s office in Binghamton, NY The Program Management Services Division at LaBella provides comprehensive management services for complex projects and multi-year capital programs. Project teams are established to provide a customized mix of business consulting, project management, financial control and monitoring, administrative, and technical support services.  Salary Range: $65,000 - $118,000 The specific salary offered may be influenced by a variety of factors including but not limited to the candidate's relevant experience, education, and work location. Responsibilities Effective leadership in a matrix organization. Initiation, Planning, Executing, and Closing Projects — defining the project WBS, Cost Baseline and OBS structure, initiating the project, building its comprehensive work plan, controlling and managing to the risks, scope, schedule and budget Managing Teams — facilitating commitment and productivity, removing obstacles, and managing teams Implementation and Management of Quality and Environmental Process and procedures on all projects focusing on meeting SPI and CPI performance indicators less than 1.0 Management of third-party projects including other transmission owners and interconnecting customers Accountable and Responsible for: Cost /Budgeting and Management Communication Management Change Management Schedule Management Construction Management Oversight Commissioning Management Oversight Risk Management Regulatory and Stakeholder Management Responsible for the execution and successful completion of the project. They are the main point of contact between contractors and the client on all project matter. The PM shall be responsible for monitoring and measuring project performance throughout the project and resolving any contract disputes relative to costs, scope, and schedule. Requirements 5-10 years in large scale projects Program Management for Utility business, Bachelor’s degree is required. Professional Engineer License and/or Project Management Professional (PMP) Certification (under Client approval) Proficient in Microsoft Project, Excel, PowerPoint, and Word. Project Management Professional or Program Management Professional Minimum five (5) years’ experience in the Substation functional area. Benefits Body, mind, and wallet—LaBella’s benefits support a holistic approach to your health and wellness, creating the foundation for physical, mental, and financial well-being. Our benefit offerings cover the must-haves (healthcare and retirement), the just-in-cases (insurances and employee assistance programs), and the cherry-on-tops (fitness reimbursements, year-end incentive pay, and tuition assistance). Visit our website for more details on benefits listed below. Flexible Work Schedule Health/Dental Insurance 401k Plan with Employer Match Short & Long Term Disability Profit Sharing Paid Time Off Leadership Development Program Fitness Reimbursement Tuition Reimbursement Referral Bonus Program Wellness Program Team Building Events Community Service Events
Binghamton, NY, USA
$65,000-118,000/year
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.