Concrete Removal and Replacement We replace your old, broken concrete or asphalt for a fixed cost. You Get Up-Front, Fixed-Cost Pricing and specific job start and completion schedule What We Do We will do a complete tear-out of your existing flatwork, either concrete or asphalt or work with your existing grass or base material, prepare a new base, set the forms, and pour a new slab. This applies to all sorts of flatwork including driveways, sidewalks, patios, garage floors, and basement floors. How We Do It We’ve been doing concrete since 1965, so we know a thing or two about this stuff. You give us a few details and we’ll call and talk to you about the job, then give you an up-front, all-in, fixed price right then and there. When We Do It In a word, timely and time specific. We will schedule the date with you, normally within 72 hours of initial contact. We have an industry unique fixed schedule structure, which includes a dedicated Monday of each week removal/preparation of your job site, allowing assurances against Mother Nature to assure the rest of the week we are focused on pouring and finishing concrete, not running from job to job tearing out and prepping and pouring. Once we get on site, we’re there through the week until completion, so your project will move quickly. This allows us unlike other concrete construction companies to have specific assigned weeks for your work and not weeks upon weeks of either hoping we show up or weeks of weeks of half finished work. What You Get We bring base materials to a thickness of 4 inches (we’ll re-use what we can from any tear-out), then pour a 4-inch slab rated for 4,000 PSI compressive strength with FiberMesh® for superior reinforcement against cracking. How Much It Costs Use the pricing table at our website to estimate your cost for gravel/grass, asphalt or concrete removal with concrete replacement. www.concreteremovalandreplacement.com Unless you have a difficult site or it requires something special, that will be your all-in final cost including materials, labor, and taxes. Tear-Out Only If you just need to have a slab removed, we are now offering concrete or asphalt tear-out without pouring a new slab. We will tear out your existing concrete or asphalt, clean up the debris, and haul it all away. Pricing is as well on our website. Calculate Your Size For a close approximation of your costs, measure the length and the width of the slab to be poured, multiply them together to get square feet (SF), then multiply that by one of the cost numbers above, based on your tear-out needs. Remember to deduct 50¢ per square foot if your size is over 1,500 SF or $1 per square foot if your size is over 3,000 SF. Real-Life Examples Thomas had a 50-year-old crumbling driveway that was 16 feet wide by 35 feet long. Multiply 16 X 35 to get 560 square feet of area. Since we’re tearing out the old concrete driveway and replacing it, Thomas multiplies that 560 X 10 to get a total cost of $5,660. There was nothing special or difficult about his site, so that was the final cost, all-in. Andrea had an ugly asphalt driveway that was cracked and lumpy. It is 20 feet wide by 78 feet long. She multiplied 20 X 78 to get 1,560 square feet for the driveway area. Since we tore out the old asphalt driveway, she might multiply 1,560 X 9 for a total cost, except that the area is over 1,000 SF, so she multiplies 1,139 X 8.50 (50¢ discount) to get an all-in cost of $13,260, saving $569.50. Attached to this written material of our company is as many as the site allows to attach of day by day, week by week, season by season completed projects, we average over 5,000 a square feet per week with our industry unique tear out, prep and pour sequence, which means tear out and prep day one, take our time and just pour days from day 2 to 6 (we normally work Saturdays during season) Fixed pricing, accurate scheduling, on site tear out and prep and solid performed work on the laying down and finishing of your concrete project. Concrete Removal and Replacement