Browse
···
Log in / Register

Spray Foam & Drywall/Plaster Installer (Schiller Park)

$18-30/hour

4229 n, 4229 Atlantic Ave, Schiller Park, IL 60176, USA

Favourites
Share

Description

THIS IS A 1099 ROLE If you have experience with Spray Foam or Drywall/Plaster Installer this role is for you. Responsibilities: Apply spray foam insulation to enhance energy efficiency in residential and commercial properties. Install, maintain, and repair drywall and plaster surfaces. Prepare and paint surfaces to specified colors and textures. Ensure all installations comply with local building codes, blueprint specifications, and safety regulations. Prepare and maintain installation equipment. Requirements: Previous experience in spray foam insulation, drywall installation, plastering, or painting. Ability to work in various physical environments and adhere to safety standards. Must have an SSN or ITN for tax purposes. English (Required) Spanish (Optional) Available to work Monday through Friday from 6 a.m. to 3 p.m. Preferred Qualifications: Experience with Graco proportioner and Fusion PC gun. Willingness to train for a career in insulation. Apply here, call or text Priscila (847) 709-3188

Source:  craigslist View original post

Location
4229 n, 4229 Atlantic Ave, Schiller Park, IL 60176, USA
Show map

craigslist

You may also like

Craigslist
Lawn Care - SA2025-006 (Sacramento)
Project Summary: SCOPE OF WORK: Mowing and Edging During the growing season (March thru November) the grass will be mowed, edged and blown clean weekly per attached calendar and color-coded map. All grass clippings and green waste will be removed on-going and placed in the Center’s 40 yard dumpster. During the slow growing season (November thru February) the grass areas throughout the Center will be mowed as needed. As the grass stops growing this time of year the contractor will spend more time pruning trees, shrubs, and removing leaves and yard debris. Weeds in all common areas and flower beds will be weed eaten weekly and debris removed. The order of mowing, edging, blowing, and pruning will start at Meadowview Rd. and progress south to the fence at Heavy Equipment. Area’s 1 and 2 are higher priority and will need to be maintained on a weekly schedule. The areas walkways, courtyards, outdoor, and common areas must be blown clear of debris. Area’s 3 and 4 are lower priority and will be maintained on a quarterly basis (every 3 month’s). Trees will be pruned around buildings 932, 933, 934, 935, 700, 710, 720, 500, 600, 200, an in front of center management on a regular schedule, 3 times per year (spring, midsummer, and Fall). This pruning will trim branches away buildings, remove any dead or low hanging branches, and disposing of the debris in the center’s 40 yard dumpster. Please email reach out for full copy of Scope of Work MANDATORY SITE WALK: October 10, 2025 10AM SUBMISSION OF PROPOSALS: October 10, 2025 by 12PM
Meadowview Rd & Coral Gables Ct (WB), Sacramento, CA 95832, USA
Negotiable Salary
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.