Browse
···
Log in / Register

Construction Scheduler

Negotiable Salary

BB&E

Kittery, ME, USA

Favourites
Share

Description

BB&E is an employee owned full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.   Position Summary  BB&E is seeking a dynamic and detail-oriented Construction Scheduler to join our team, supporting BB&E’s A&AS contract, assisting NAVFAC Mid-Atlantic, and supporting facilities design and construction projects on-site at Kittery, ME.   Job Duties  Understanding interrelated construction projects within high-visibility Program Initiatives critical to the Navy’s mission. Manage multiple priorities and independently develop technical recommendations or solutions for scheduling issues and time impacts on complex problems encountered during construction contract administration. Presenting technical schedule analysis results (verbal and graphical/tabular) to leadership and non-technical stakeholders, with recommendations for schedule management when requested. Developing and maintaining scheduling training for project teams, including training on network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage. Guiding scheduling specifications for incorporation into project contract documents. Participating in NAVFAC-sponsored Scheduling Working Groups to address lessons learned, propose software changes, and identify training requirements. Supporting the development of schedule software templates for contractors to create baseline schedules. Project delivery methods include both design-bid/build and design-build. Specific Responsibilities:  Initial Construction Planning: Review the scopes of individual projects and based on actual performance metrics and project conditions, propose:  Recommended provisions for inclusion in contract schedule specifications. Reasonable construction durations to include in the RFP or solicitation. Participate in Technical Evaluation Teams (TET) when selection factors involve contractor schedule and work plan submissions.  Review and provide recommendations to the TET Chair. Review of Baseline Schedules: Review baseline schedules for validity, reasonableness, and depth of construction planning. Ensure compliance with contract schedule specifications. Ongoing Schedule Oversight: Lead the project team in reviewing monthly contractor updates for validity and conformance to contract requirements. Coordinate with technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and field offices. Work closely with the Contracting Office, design management, estimating, and construction teams to ensure contract changes, non-conformances, and requests for information are accurately reflected in contract schedule updates. Review the critical path and lesser float paths to determine progress concurrency and shared project float. Advise the project team on the disposition of contractor-submitted schedule updates. Alert the project team when the As-Built schedule diverges from the accepted Baseline Schedule. Assist project teams in assessing contractor adherence to the project schedule. Schedule Analysis: Compile Time-Impact-Analysis (TIA) issue files and timelines as issues arise. Review the baseline schedule and schedule updates to determine adherence to the original baseline, apart from identified time impacts. Prepare as-built schedules, including narrative and graphical/tabular visualizations, to highlight delays and/or accelerations that affected timely project completion. Assess the impact of contract changes on the schedule and support the development of the Government's position regarding delays and/or liability. Utilize computer-based scheduling programs, applying Critical Path Method (CPM) analysis. Assist in validating impacts on the construction schedule by comparing work reports. Provide analysis and recommendations on how contractors can mitigate delays and meet the contract completion date. Requirements Key Qualifications  U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required Certification: Registration as a Planning and Scheduling Professional (PSP) is desirable Strong Communication Skills: Excellent verbal and written communication skills, with the ability to effectively convey complex technical concepts to diverse audiences and experience presenting complex schedule analyses to non-technical stakeholders. Software: Proficiency using Primavera P6- Oracle and MS Office including Excel, Word, and PowerPoint Self-Starter: Highly motivated, with the ability to manage multiple tasks and deadlines autonomously Experience & Education  Experience: A minimum of 7 years of construction CPM scheduling experience utilizing Primavera P6 or its earlier versions is required Experience conducting forensic reviews of Time-Impact Analyses (TIA) in relation to time extension requests or claims. Expertise in Earned Value Management in a construction environment. Ability to evaluate Contractor baseline schedules and monthly updates. Education: A minimum of a Bachelor’s degree is required Physical Requirements  Ability to stand/walk/climb/kneel/crouch and remain in a stationary position/sit at least 60% of the time Ability to operate office equipment, including computer, copy machine, phone, etc. Ability to use hands to finger, handle or feel objects or controls; reach with hands and arms Capable of lifting up to 10 lbs. Ability to see details of objects that are less than a few feet away Ability to understand the speech of another person, speak clearly so listeners can understand, and talk or hear both in person and by telephone Benefits Compensation, Benefits & Perks  Competitive compensation packages  Participation in the Employee Stock Ownership Plan – BB&E is 100% employee-owned! Discretionary bonus *Medical, Dental, and Vision Insurance with health care concierge *Employer provided Short-Term & Long-Term disability *Employer provided Life insurance *Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits *Generous PTO plus 11 paid holidays Traditional & Roth 401(k) options with fully vested employer match Tuition reimbursement & professional development Employee referral program Employee discounts Employee Assistance Program (EAP) Pet insurance discount *Applies only to full-time employees   *BB&E is an equal-opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, pregnancy, genetic information, disability, status as a protected veteran, or any other protected category under applicable federal, state, and local laws.

Source:  workable View original post

Location
Kittery, ME, USA
Show map

workable

You may also like

Workable
Board Certified-(M.D, D.O) Oakland, CA-Ophthalmology Advisor, Certified for IME
As Physician Reviewer/Advisor for Independent Medical Exams (IME), you will utilize clinical expertise and reviews insurance appeals, and prospective and retrospective claims. The Physician Reviewer will provide an interpretation of the medical necessity of services provided by other healthcare professionals in compliance with client specific policies, nationally recognized evidence-based guidelines, and standards of care. MAJOR DUTIES AND RESPONSIBILITIES: Reviews all medical records and addresses each question posed by the client utilizing client specific criteria or other nationally recognized evidence-based criteria Ensures that the rationale for the determination is clear, concise, and contains adequate supporting documentation to substantiate the decision Identifies, critiques, and utilizes current criteria and resources such as national, state, and professional association guidelines and peer-reviewed literature that support sound and objective decision-making and rationales in reviews; refrains from using case studies, cohorts, and the like to make decisions due to their limited sample sizes Provides copies of any criteria utilized in a review with the report in a timely manner Returns cases on or before the due date and time Makes telephone calls as mandated by the state and/or client specifics Maintains proper credentialing and state licenses and any special certifications or requirements necessary to perform the job Attends all required orientation and training Performs other duties as assigned including identifying and responding to quality assurance issues, complaints, regulatory issues, depositions, court appearances, or audits Board certification required, active practice required PLEASE BE AWARE: In the interest of the security of all parties, Dane Street will never conduct interviews via text or request checks from candidates for any reason including the purchase of equipment.  Benefits Benefits Robust opportunity for supplemental income Schedule flexibility and predictable work hours - You choose services and case types, dictate volume, and conduct exams and reviews based on your schedule availability No doctor/patient relationship is established and no treatment is provided. These are advisory-only opinions. Enhanced industry expertise strengthening your medical practice with medical necessity and utilization review/management expertise Expanded credentials as an expert in Independent Medical Exams and physician advisor services Fully prepped cases, streamlined case flow, transcription services at no cost, and user-friendly work portal
Oakland, CA, USA
Negotiable Salary
Workable
Board-Certified Radiologist for Remote Record Review- Las Vegas, Nevada
Dane Street is expanding our physician panel!  This is a telework opportunity for supplemental income for physicians providing a caseload customized to your schedule. Our physician panel is comprised of independent contract reviewers (1099) compensated on a per-case basis. The ideal candidates will hold a Nevada license and be Board Certified in Radiology. Requirements As Physician Reviewer/Advisor, you will utilize clinical expertise and reviews insurance appeals, and prospective and retrospective claims. The Physician Reviewer will provide an interpretation of the medical necessity of services provided by other healthcare professionals in compliance with client specific policies, nationally recognized evidence-based guidelines, and standards of care. MAJOR DUTIES AND RESPONSIBILITIES: Reviews all medical records and addresses each question posed by the client utilizing client specific criteria or other nationally recognized evidence-based criteria Ensures that the rationale for the determination is clear, concise, and contains adequate supporting documentation to substantiate the decision Identifies, critiques, and utilizes current criteria and resources such as national, state, and professional association guidelines and peer-reviewed literature that support sound and objective decision-making and rationales in reviews; refrains from using case studies, cohorts, and the like to make decisions due to their limited sample sizes Provides copies of any criteria utilized in a review with the report in a timely manner Returns cases on or before the due date and time Makes telephone calls as mandated by the state and/or client specifics Maintains proper credentialing and state licenses and any special certifications or requirements necessary to perform the job Attends all required orientation and training Performs other duties as assigned including identifying and responding to quality assurance issues, complaints, regulatory issues, depositions, court appearances, or audits Board certification required, active practice required PLEASE BE AWARE: In the interest of the security of all parties, Dane Street will never conduct interviews via text or request checks from candidates for any reason including the purchase of equipment.  Benefits Robust opportunity for supplemental income Schedule flexibility and predictable work hours - You choose services and case types, dictate volume, and conduct exams and reviews based on your schedule availability No doctor/patient relationship is established and no treatment is provided. These are advisory-only opinions. Enhanced industry expertise strengthening your medical practice with medical necessity and utilization review/management expertise Expanded credentials as an expert in Independent Medical Exams and physician advisor services Fully prepped cases, streamlined case flow, transcription services at no cost, and user-friendly work portal  Dane Street supports all referral processes, scheduling, preps cases extensively, prepares all medical records, provides transcription services as applicable, facilitates all client communications, and ensures the quality and timeliness of all reports and report delivery.   Apply for this job
Las Vegas, NV, USA
Negotiable Salary
Workable
Bilingual Community Health Worker
The Community Health Worker (CHW) plays a vital role in running Connect For Life, our groundbreaking program that connects neighbors for better health, empowering them to live longer, healthier lives while finding joy in one another’s company. Reporting to the Area Manager, the CHW is a trusted community member who serves as a link between health, social services and our members and those that support them to increase access to and improve the quality of services. The successful CHW will radiate confidence and empathy, establish trust with our members, and skillfully switch between group and one-on-one interactions. They will utilize multiple means as necessary to connect and engage with members, including in-person group meetings, one-on-one home visits, and telephone outreach. Company Overview Wider Circle works with health plans and providers nationally to deliver unique community care programs that connect neighbors for better health. Centered on trusted relationships, Wider Circle connects health plan members with like-minded neighbors to inform, support and motivate one another, empowering them to be more proactive about their health. Wider Circle’s trusted delivery network has been proven to drive resilience, improve member experience and engagement, and reduce inappropriate utilization and has been published in peer-reviewed literature. Today, Wider Circle offers its unique neighborhood care programs to tens of thousands of communities nationwide. To learn more, visit widercircle.com.   Responsibilities The CHW is an integral part of the member’s care team and works closely with the Case Manager. The CHW will lead the Connect For Life program, using Wider Circle’s approved curriculum and materials to build trust, promote health, and encourage engagement. The CHW will plan, promote, and host virtual and in-person events for members, fostering relationships with and among members to support wellness outcomes. On a regular cadence and as needed, the CHW will reach out to members(by phone and in-person) to check-in with them, identify and address needs, and encourage participation in local events. As needed, the CHW will conduct home visits to support members, provide health and social support resources, and encourage participation in the Enhance Care Management program compliance with the care plan. The CHW will establish/maintain partnerships with local community-based organizations to bring additional resources to our members' attention. The CHW will record details of interactions with members in the case management system (CMS) using a computer, tablet, or smartphone. The CHW will be accountable for achieving membership growth targets, engagement and retention goals and monitor the success of their efforts by tracking member attendance, feedback, and other metrics. The CHW will identify members who are natural leaders and invite them to serve as Connect For Life Ambassadors who will assist in connecting with members and organizing member meetings. Requirements Certified Community Health Worker Have Enhanced Care Management or complex care management experience Have 3+ years of relevant community outreach, teaching, facilitation, volunteer, or healthcare experience Embrace a remote team working environment, working independently with little oversight Understand the socio-economic and public health challenges facing disenfranchised people Have excellent presentation and communication skills, both written and verbal, and be comfortable speaking one-on-one and to larger groups Have an outgoing personality and unwavering, positive attitude, with the ability to comfortably engage with others in-person and via video conference or phone Love building relationships and networking and have a knack for motivating and influencing different types of people Great at organizing, prioritizing, and following through on commitments Have strong computer skills and the ability to navigate web-based and app-based systems Have reliable transportation and be comfortable traveling to members’ homes Willing to commute 20 - 40 miles Have a flexible schedule and be able to work outside of regular business hours and when necessary Be committed to a drug-free workplace and ready for pre-employment substance abuse testing and background checks Physical Requirements Safely and consistently drive to public places up to 40 miles away from their home Frequently carry up to 30 pounds of supplies Frequently stand and speak publicly including projecting their voice in indoor and outdoor spaces in front of groups Routinely sit, stand, and walk to allow for the interacting with members for the duration of a member meeting, home visit, or one-on-one interaction Ability to see and hear well enough to interact with members by phone and in-person and respond to member questions Ability to use a computer, tablet, smartphone or other device to update information in different secure systems Benefits Compensation  As a venture-backed company, Wider Circle offers competitive compensation including: Performance-based incentive bonuses Opportunity to grow with the company Comprehensive health coverage including medical, dental, and vision 401(k) Plan Paid Time Off Employee Assistance Program Health Care FSA Dependent Care FSA Health Savings Account Voluntary Disability Benefits Basic Life and AD&D Insurance Adoption Assistance Program Training and Development Starting salary: $24.00-$25.00 And most importantly, an opportunity to LOVE, LEARN, and GROW with us! Wider Circle is proud to be an equal-opportunity employer that does not tolerate discrimination or harassment of any kind. Our commitment to Diversity & Inclusion supports our ability to build diverse teams and develop inclusive work environments. We believe in empowering people and valuing their differences. We are committed to equal employment opportunity without consideration of race, color, religion, ethnicity, citizenship, political activity or affiliation, marital status, age, national origin, ancestry, disability, veteran status, sexual orientation, gender identity, gender expression, sex or gender, or any other basis protected by law.
Los Angeles, CA, USA
$24/hour
Workable
Fast Food General Manager
Are you ready to take your career to the next level with Parallel Employment? We’re on the lookout for a dynamic Fast Food General Manager to lead the charge at one of our vibrant fast-food locations in Arcade NY! This is your chance to shine in a role where you can inspire a team, drive results, and ensure every customer leaves with a smile. As the General Manager, you’ll be at the forefront of operations, turning fast-food dining into a delightful experience. Your leadership will cultivate a fantastic team atmosphere, oversee daily operations, and ensure that our guests receive the high-quality service they’ve come to love. Together, we'll make this restaurant a must-visit destination! Requirements Recruit, train, and lift up a diverse team to reach their full potential while fostering a positive team culture. Provide encouragement, direction, and constructive feedback to ensure your team meets and exceeds performance goals. Instill a sense of accountability while celebrating wins and guiding the team through challenges. Uphold food safety, quality, and brand standards with the utmost dedication. Seamlessly manage daily operations with efficiency, ensuring smooth opening and closing rituals. Handle scheduling, inventory, and maintenance with ease to keep everything running like clockwork. Stay compliant with company policies and all relevant regulations while leading by example. Champion a customer-first culture, making every guest feel valued and appreciated. Lead with exemplary hospitality, deftly addressing any customer questions or concerns. Oversee financial performance, including managing P&L, labor costs, and driving profitability. Be the spark for local marketing initiatives, energizing the community and driving sales. Spot opportunities for growth and improvement, always keeping an eye out for innovative solutions. What You Bring to the Table: A proven track record in leadership within a restaurant, retail, or hospitality environment (Quick Service Restaurant experience is a plus!). The ability to inspire, develop, and motivate people to be their best. A genuine passion for putting guests first, embracing quality, and pursuing service excellence. Solid business acumen with a hands-on approach to managing financial performance. Excellent problem-solving skills, multitasking capabilities, and the ability to thrive under pressure. Food safety certification (like ServSafe) along with other industry credentials. Flexibility to work various shifts, including weekends and holidays. Must be at least 18 years old with reliable transportation to get to the restaurant. Join us at Parallel Employment, where your leadership can shine! Are you ready to make a positive impact? Apply today! Benefits Competitive salary & performance-based bonuses (will be discussed at time of interview $50K-$60K annual salary) Comprehensive benefits package (medical, dental, vision, & more) Paid time off & company holidays Ongoing leadership training & development opportunities Career growth within one of the largest franchise groups We are an equal opportunity Employer #IND456
New York, NY, USA
$50,000-60,000/year
Workable
Personal Banker/Member Services Representative III
Founded in 1937, Advancial is one of the oldest and largest credit unions in the country. We are an established and proactive full-service financial institution providing personal, convenient and advanced financial services to individuals and select group partners. Our mission is to create lasting value for our members through superior service, quality products, and innovative solutions.   At Advancial, we always strive to provide the best service and products to our members because we love what we do.  We work together to build a culture that promotes a positive employee experience.  We’ve been named a Best Company to Work for in Texas for nine consecutive years and a Best and Brightest Company to Work For nationally and locally because we’re serious about building fulfilling careers and not just day jobs.   We invite you to learn more about this position and what Advancial has to offer by completing our online application.  Requirements This position is located in our Anchorage Branch. Must be willing to work at least two Saturday shifts per month. Supervisor and loan experience a plus.    SUMMARY Interviews loan applicants and processes applications.  Gathers background information and analyzes credit history.  Serves as liaison between member and the Credit Union.  Provides account information, opens new accounts, and handles member's daily credit union needs.  This position requires the employee to be service-oriented, self-motivated, and to be able to perform a variety of tasks.   ESSENTIAL DUTIES AND RESPONSIBILITIES Cross-sells a wide array of credit union products including loan products, deposit products and electronic services such as CUAnywhere and online banking.    Meets established goals for acceptable penetration or monthly sales numbers on all ancillary loan products. Interviews applicant and requests specified information for loan application.  Ensures loan agreements are complete and accurate according to policy.  Serves as subject matter expert and provides assistance to members about products that best meet their needs.  Acting supervisor in the absence of the Branch Manager.  This includes the opening and closing of branch as needed.  Works loan to obtain approval from centralized lending and then closes loan with member.  Responsible for securing liens on motor vehicles, and ensuring that the right documentation includes appropriate lien position on home equity loans.  Opens new accounts, checking, certificates, money markets, IRA or CD accounts.  Verifies eligibility for new account and processes through ChexSystems prior to opening new accounts.  Processes check orders for members. Responsible for maintaining a working knowledge of lending procedures, Credit Union guidelines, Lending Software, and the benefits and features of all loan products.  May perform the following teller duties:  receives checks and cash for deposit, verifies amount, and examines checks for endorsements.  This includes loan payments and processing credit card payments and cash advances.  Cashes checks and pays out money after verification of signatures and member balances.  Places holds on accounts for uncollected funds in accordance with Advancial policies and procedures.  Apply payments to AFCU loans, credit card payments and cash advances.  Enters customers' transactions into computer to record transactions, and issues computer generated receipts. Responsible for picking up and processing the Night Drop deposits from the branch ATM. Responsible for correcting all new account exceptions or transactional errors under Teller Number.  Provides account information and handles member's daily credit union needs.  Provides a variety of transaction services to members in the branch and by phone such as balance inquiry, transfer of funds, history information, stop payments or photocopy of check(s), etc.  This includes researching and resolving member concerns.  Processes and balances bond redemptions when necessary.  Makes copies and files correspondence and other records on a daily basis.  Opens and closes the branch as needed.   The salary range for this position is $24.74 -$30.93 /hr. and is based on relevant experience.
Anchorage, AK, USA
$24-30/hour
Workable
Senior Accountant-Plainview NY
Pay: $60,000.00 - $65,000.00 per year Job description: Job Summary We are seeking a detail-oriented and experienced Senior Accountant to join our dynamic finance team. The ideal candidate will have a strong background in corporate accounting, financial management, and regulatory reporting. This role involves overseeing financial operations, ensuring compliance with GAAP, and providing mentorship to junior accounting staff. The Senior Accountant will play a crucial role in financial statement preparation, analysis, and reporting for both non-profit and for-profit entities. Responsibilities Responsible for monthly closing of books and records and issuing monthly financial statements Prepare monthly analysis of balance sheet and income statement accounts Ensure the accuracy of data in each account by researching the nature of recorded transaction, reviewing underlying supporting documentation (vendor bills etc.), prepare imports into Quickbooks and preparing journal entries as applicable Prepare reconcilaton of inventory and credit card transaction Develop, maintain and distribute ad-hoc reporting and financial models as needed Monitor and identify cost savings opportunities across the companyInteracts with vendors and internal stakeholders to set up processes and resolve issues and ensure cost savings Assists in evaluation, recommending, maintaining and monitoring appropriate internal controls Support the continued development of the company's accounting policies and procedures including making the accounting process more efficient Work with external auditors at year end for timely issuance of financial statements Experience Bachelors Degree in Accounting 3-5 years accounting experience with general accounting and financial reporting Strong interpersonal and communication skills Ability to work in a fast pace growth environment Self-Motivated, goal orientated, results driven and excellent at mult-tasking Ability to work under pressure with strict time frames Flexibility to adapt to the changing needs and direction of leadership Ability to focus on details while completing task timely Advance Excel skills a must QuickBooks Skills a must Employee Benefits Include: • Medical Plan • Dental Plan • Vision Plan • 401K , Vacation and Sick Time Job Type: Full-time Benefits: 401(k) Dental insurance Health insurance Paid time off Vision insurance Work Location: In person
Plainview, NY, USA
$60,000-65,000/year
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.