Browse
···
Log in / Register

Construction Scheduler

Negotiable Salary

BB&E

Kittery, ME, USA

Favourites
Share

Description

BB&E is an employee owned full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.   Position Summary  BB&E is seeking a dynamic and detail-oriented Construction Scheduler to join our team, supporting BB&E’s A&AS contract, assisting NAVFAC Mid-Atlantic, and supporting facilities design and construction projects on-site at Kittery, ME.   Job Duties  Understanding interrelated construction projects within high-visibility Program Initiatives critical to the Navy’s mission. Manage multiple priorities and independently develop technical recommendations or solutions for scheduling issues and time impacts on complex problems encountered during construction contract administration. Presenting technical schedule analysis results (verbal and graphical/tabular) to leadership and non-technical stakeholders, with recommendations for schedule management when requested. Developing and maintaining scheduling training for project teams, including training on network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage. Guiding scheduling specifications for incorporation into project contract documents. Participating in NAVFAC-sponsored Scheduling Working Groups to address lessons learned, propose software changes, and identify training requirements. Supporting the development of schedule software templates for contractors to create baseline schedules. Project delivery methods include both design-bid/build and design-build. Specific Responsibilities:  Initial Construction Planning: Review the scopes of individual projects and based on actual performance metrics and project conditions, propose:  Recommended provisions for inclusion in contract schedule specifications. Reasonable construction durations to include in the RFP or solicitation. Participate in Technical Evaluation Teams (TET) when selection factors involve contractor schedule and work plan submissions.  Review and provide recommendations to the TET Chair. Review of Baseline Schedules: Review baseline schedules for validity, reasonableness, and depth of construction planning. Ensure compliance with contract schedule specifications. Ongoing Schedule Oversight: Lead the project team in reviewing monthly contractor updates for validity and conformance to contract requirements. Coordinate with technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and field offices. Work closely with the Contracting Office, design management, estimating, and construction teams to ensure contract changes, non-conformances, and requests for information are accurately reflected in contract schedule updates. Review the critical path and lesser float paths to determine progress concurrency and shared project float. Advise the project team on the disposition of contractor-submitted schedule updates. Alert the project team when the As-Built schedule diverges from the accepted Baseline Schedule. Assist project teams in assessing contractor adherence to the project schedule. Schedule Analysis: Compile Time-Impact-Analysis (TIA) issue files and timelines as issues arise. Review the baseline schedule and schedule updates to determine adherence to the original baseline, apart from identified time impacts. Prepare as-built schedules, including narrative and graphical/tabular visualizations, to highlight delays and/or accelerations that affected timely project completion. Assess the impact of contract changes on the schedule and support the development of the Government's position regarding delays and/or liability. Utilize computer-based scheduling programs, applying Critical Path Method (CPM) analysis. Assist in validating impacts on the construction schedule by comparing work reports. Provide analysis and recommendations on how contractors can mitigate delays and meet the contract completion date. Requirements Key Qualifications  U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required Certification: Registration as a Planning and Scheduling Professional (PSP) is desirable Strong Communication Skills: Excellent verbal and written communication skills, with the ability to effectively convey complex technical concepts to diverse audiences and experience presenting complex schedule analyses to non-technical stakeholders. Software: Proficiency using Primavera P6- Oracle and MS Office including Excel, Word, and PowerPoint Self-Starter: Highly motivated, with the ability to manage multiple tasks and deadlines autonomously Experience & Education  Experience: A minimum of 7 years of construction CPM scheduling experience utilizing Primavera P6 or its earlier versions is required Experience conducting forensic reviews of Time-Impact Analyses (TIA) in relation to time extension requests or claims. Expertise in Earned Value Management in a construction environment. Ability to evaluate Contractor baseline schedules and monthly updates. Education: A minimum of a Bachelor’s degree is required Physical Requirements  Ability to stand/walk/climb/kneel/crouch and remain in a stationary position/sit at least 60% of the time Ability to operate office equipment, including computer, copy machine, phone, etc. Ability to use hands to finger, handle or feel objects or controls; reach with hands and arms Capable of lifting up to 10 lbs. Ability to see details of objects that are less than a few feet away Ability to understand the speech of another person, speak clearly so listeners can understand, and talk or hear both in person and by telephone Benefits Compensation, Benefits & Perks  Competitive compensation packages  Participation in the Employee Stock Ownership Plan – BB&E is 100% employee-owned! Discretionary bonus *Medical, Dental, and Vision Insurance with health care concierge *Employer provided Short-Term & Long-Term disability *Employer provided Life insurance *Employee options for supplemental life, supplemental accident, critical illness, hospital indemnity, and Identity theft protection benefits *Generous PTO plus 11 paid holidays Traditional & Roth 401(k) options with fully vested employer match Tuition reimbursement & professional development Employee referral program Employee discounts Employee Assistance Program (EAP) Pet insurance discount *Applies only to full-time employees   *BB&E is an equal-opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, pregnancy, genetic information, disability, status as a protected veteran, or any other protected category under applicable federal, state, and local laws.

Source:  workable View original post

Location
Kittery, ME, USA
Show map

workable

You may also like

Workable
Registered Behavior Technician RBT/BT - Full time
Registered Behavior Technician BT/RBT – ABA Centers of Florida Full-Time Miramar, FL Hourly: $21.00 Growth Opportunity in Healthcare—Will Train! Do you love working with kids? Looking for a new career in healthcare with a stable, growing company that supports and values its team members? Come be a Registered Behavior Technician (RBT) with us! We offer paid training and thorough preparation for the RBT exam through our ABA Academy of Excellence! Plus, you'll benefit from ongoing career support and advancement opportunities. Interested in Furthering Your Career in ABA? We Can Help! For career-minded RBTs who wish to pursue advancement, we offer opportunities to: · Advance your RBT career to positions like Lead RBT, RBT Supervisor, BCBA, and other corporate or clinic positions · Apply for our full scholarship at Temple University for Master’s in ABA · Join our BCBA Apprentice Program (after 90 days of full-time work) What You’ll Do · Support individuals with autism in the home, in the community, or in one of our new centers · Teach daily living skills and social skills using effective behavior and evidence-based treatments · Collect, organize, and summarize unbiased data during sessions · Collaborate and participate in clinical team meetings and ongoing training · Implement training and therapy sessions designed by a Board Certified Behavior Analyst (BCBA) · Proactively communicate and collaborate effectively with fellow RBTs, BCBAs, families, Executive Directors, and additional team members to support the client's needs Requirements Education/Experience and Other Requirements High-school diploma or equivalent Must be at least 18 years of age (21 years or older if located in New Jersey) Availability during after-school hours, weekends, and holidays Consistent, reliable transportation, a valid driver’s license, and car insurance to provide in-home services for clients Must maintain clean background/drug screenings and driving record BT: Ability to attend our 40-hour RBT fulltime paid training course and be eligible to pass the RBT exam within 45 days of hire RBT: Ability to attend required paid training program Benefits Benefits 21 paid days off (15 days of PTO, which increases with tenure, plus 6 holidays) Medical, dental, vision, long-term disability, and life insurance Generous 401(k) with up to 6% employer match Mentoring for team members who wish to become BCBAs Paid Registered Behavior Technician training CEU reimbursement Tuition reimbursement $400 monthly gas stipend Opportunity for full-tuition scholarship to Temple University's Master's in ABA program Performance bonus potential **$5,000 bonus for referring BCBAs to work with us. **$500 bonus for referring RBTs to work with us. About ABA Centers of Florida ABA Centers of Florida is a great place to work! Don't take our word for it, though. We're listed in Inc. magazine’s Best in Business list for “Health Services,” honoring companies that have made an extraordinary impact in their fields and on society. Recruiter ID: #LI-TF1 ABA Centers of Florida participates in the U.S. Department of Homeland Security E-Verify program.
Miramar, FL, USA
$21/hour
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.