Browse
···
Log in / Register

Commissioning Agent/Manager - Hyperscale Data Center Construction

Negotiable Salary

Legacy Professional Services

Rayville, LA 71269, USA

Favourites
Share

Description

The Commissioning Agent/Manager is a critical member of the QA/QC team responsible for ensuring all building systems and mission-critical infrastructure in a hyperscale data center are designed, installed, tested, and verified to meet the owner’s operational requirements. This role bridges construction, quality, and operations by managing commissioning activities across mechanical, electrical, plumbing, life safety, and specialty systems. The Commissioning Agent/Manager drives quality and performance verification through structured commissioning processes, system testing, and integrated functional performance demonstrations, ensuring a seamless turnover to the client. Requirements Commissioning Planning & Coordination · Develop, implement, and manage the Commissioning Plan in alignment with project QA/QC standards, owner requirements, and industry best practices. · Coordinate commissioning activities across disciplines with the QA/QC Manager, trade partners, commissioning authorities, and the client. · Ensure compliance with project specifications, client standards, and applicable codes (ASHRAE, IEEE, NEC, NFPA, etc.). · Participate in design reviews and preconstruction quality planning to integrate commissioning requirements early. System Verification & Testing · Oversee pre-functional checklists, equipment start-up procedures, and system readiness inspections. · Direct and document functional performance testing of mechanical, electrical, plumbing, fire/life safety, security, and specialty systems. · Validate that system sequences of operation perform as designed and meet owner project requirements. · Manage integrated systems testing (IST) for mission-critical environments, ensuring resilience and redundancy verification. Documentation & Reporting · Maintain commissioning logs, issue tracking, and resolution documentation using project management tools (e.g., Procore, Bluebeam, BIM 360). · Provide detailed commissioning reports and turnover documentation, including O&M manuals, training records, and system performance data. · Document and track deficiencies, coordinate corrective actions with contractors, and verify close-out. Stakeholder Engagement · Act as the liaison between QA/QC, construction teams, design engineers, trade contractors, and client representatives on commissioning matters. · Lead commissioning meetings, report progress, and communicate issues clearly to project leadership and the client. · Provide training and orientation for client operations staff during system handover. Qualifications · Bachelor’s degree in Mechanical, Electrical, or Controls Engineering; Construction Management; or related field (preferred). · 5–10 years of commissioning experience in mission-critical facilities (data centers, hospitals, labs, etc.). · Deep knowledge of MEP systems, building automation systems (BAS), and mission-critical infrastructure (UPS, generators, CRAC/CRAH, fire suppression, etc.). · Familiarity with hyperscale owner commissioning standards (Meta, Google, Microsoft, Amazon, etc.). · Proficiency with commissioning documentation, testing tools, and project software. · Strong communication and organizational skills; ability to lead cross-functional teams. · Certifications such as CxA, CxM, or LEED AP preferred. Key Competencies · Technical expertise in MEP and mission-critical systems. · Methodical, detail-oriented, and documentation-driven. · Strong problem-solving and troubleshooting skills. · Ability to coordinate multiple stakeholders under tight schedules. · Committed to ensuring zero-defect system delivery and operational readiness.

Source:  workable View original post

Location
Rayville, LA 71269, USA
Show map

workable

You may also like

Workable
Robotics Technician
The Company Prime Robotics is a global provider of intelligent automation and autonomous mobile robots for the warehousing, distribution, e-commerce, and material handling industries. Founded in 2015 and based in Denver, Colorado, the company focuses on optimizing the fulfillment ecosystem through innovative robotic solutions. Their offerings include a suite of robotic hardware and software designed to enhance efficiency, scalability, and accuracy in various sectors, such as logistics and manufacturing. Prime Robotics aims to revolutionize warehouse operations by automating tasks like sorting, picking, packing, and shipping, thereby reducing labor costs and improving overall operational efficiency. You in The Role and on The Team In this role, you are a highly motivated Robotics Technician to join our team and contribute to the deployment, service, and monitoring for our robotic solutions. As a Robotics Technician, you will play a critical role in shaping the future of our warehouse automation solutions delivery to customers, working closely with customers and internal engineering teams to ensure the successful operation of our robotic system.     A Day in the Life at Prime Robotics  Monitor and observe the operation of customer robot fleets to ensure optimal performance  Be the point person to solve warehouse automation problems with the customers as they arise  Proactively identify and troubleshoot issues, providing timely solutions to minimize downtime to the customer  Perform hardware troubleshooting, including electronics, motors, and cabling, ensuring optimal functionality of the robot fleet.  Work hands-on with electromechanical systems in a shop environment, contributing to the efficient operation of the robots.  Conduct robot inspections and perform preventative maintenance  Diagnose and troubleshoot software issues, ensuring the smooth functioning of the robotic systems.  Document operational data and generate reports to track performance  Document all fixes to robots and maintain spare parts inventory  Provide support to team members and customers during project deployment and post-sales phases  Assist sales teams in providing on-site demos to potential customers  Implement warehouse automation solutions on sight new customers and expansions with existing customers  Flexibility in work hours to collaborate with colleagues in other time zones  Provide feedback to internal teams on customer needs, product performance, and potential areas for improvement  Familiarity with navigating Linux/Ubuntu systems is a plus  Demonstrate soldering expertise when necessary, maintaining and repairing electronic components.  Exhibit a quick learning ability and an exceptional work ethic, adapting swiftly to evolving challenges.  Must have first-rate attention to detail and be meticulous in all tasks.  Requirements You LOVE Robots!  You love to tinker and see how things work- you have a curious mind!   Strong Customer Service skills  Proactive and self-motivated with the ability to work independently and adapt to changing situations.  Familiarity with mechanical or electrical systems gained through work experience or educational background.  Software experience also a plus.  Strong problem-solving skills and the ability to think analytically in fast-paced operational environments.  Excellent communication skills to effectively interact with customers and internal teams  Detail-oriented with strong organizational skills to prioritize tasks and manage multiple projects simultaneously.  Demonstrate soldering expertise when necessary, maintaining and repairing electronic components.  Exhibit a quick learning ability and an exceptional work ethic, adapting swiftly to evolving challenges.  Document all fixes to robots and maintain spare parts inventory  Ability to troubleshoot and work independently and as part of a team  Good driving record and reliable transportation to and from job locations  Must be able to work on your feet most of the day and lift at least 50 lbs.  Willingness to travel to client sites as needed (~10% travel)    Nice to have:  PLC programming/controls engineering and programming of automated systems  Linux skills  Prior experience with Warehouse Management System (WMS) software is a valuable asset.  Experience maintaining lithium batteries  Knowledge of basic networking  Familiarity with databases and proficiency in writing mySQL queries   Benefits We value our team members and offer meaningful benefits: Employer-subsidized medical, dental, and vision insurance plans to support your health and wellbeing Dedicated vacation and sick leave that allows you to recharge and take care of yourself when needed Invaluable hands-on experience with cutting-edge robotics technology that keeps your skills at the industry forefront A collaborative culture where innovation thrives and your work has a real impact The excitement of contributing to transformative technology in a fast-growing industry Prime Robotics is proud to be an EEOE, M/F/D/V, and we are committed to diversity both in practice and spirit at the corporate level.  Prime Robotics participates in E-Verify. E-Verify is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility. We unfortunately cannot offer visa sponsorship for this position. Location: Wellford, SC (On-site, local candidates only)  Shift: Day (M-F) Salary Range: $60,000-$75,000 Travel: Approximately 10%
Wellford, SC, USA
$60,000-75,000/year
Workable
Electrical Engineer - Manufacturing Operations (Onsite)
Why work for CVRx? CVRx pioneers' unique therapies that harness and harmonize the body’s natural systems, benefiting society and making CVRx a universal role model in healthcare. We value our commitments to others and continue to overcome challenges through determination, collaboration and purpose. If our culture and values speak to you, and if you have a passion for cutting-edge medical technologies, join our team and our mission to help others live better lives. This is a full-time role and our selected candidate will be expected to work onsite, Monday through Friday, at our Brooklyn Park, MN Headquarters. A day in the life: As an Electrical Engineer, you’ll play a vital role on our Operations team, specializing in the electrical testing and support of our innovative implantable device and its subcomponents. You’ll be at the forefront of ensuring equipment and materials are used effectively, with a focus on maximizing production output while upholding the highest standards in safety, quality, and cost. In this position, you’ll collaborate closely across teams to resolve technical challenges, drive improvements, and support changes that impact workflow, data integrity, and overall manufacturing performance. Your expertise will directly contribute to the success and reliability of a life-changing medical device. Key Duties and Responsibilities: General Operations Support production staff when technical issues arise, perform root-cause analysis on said issues, and implement quality solutions in a timely manner. Research, build business case, and implement capital expenditures to improve operational efficiencies in a manufacturing environment. Develop and recommend new processes and technologies to improve product quality and cost-effectiveness. Follow established manufacturing techniques and operating equipment specifications, identifying process improvements and resolution to issues where possible. Participate in providing technical direction, training, and certification for operators performing detailed process steps to ensure that production assemblers, testers, inspectors, and support staff have necessary skills, appropriate documentation, tooling, and process control capability. Participate in the qualification and development of suppliers for components, sub-assemblies, and processes. Implement design and development activities related to operations assessment, process development, and product validation. Provide technical direction, training, and certification for operators performing detailed process steps to ensure that production assemblers, testers, inspectors, and support staff have necessary skills, appropriate documentation, tooling, and process control capability. Support non-conforming material reports (NMR) and corrective and preventative actions (CAPA) processes. Support day-to-day operations relating to manufacturing, supply chain and facilities as necessary. Perform miscellaneous duties as assigned by manager. Test Systems Develop and build test environments and test cases for manufacturing mechanical and electrical systems. Develop test plans and strategies based on regulatory requirements, industry standards, and product specifications. Design and execute test protocols to evaluate the performance, functionality, and safety of medical devices. Support the creation and maintenance of software programs and algorithms to support automating test procedures. Design, assemble and operate custom test fixtures and equipment. Participate in establishing test procedures and coordinating testing of products under development. Document technical issues and solutions and suggest fixes and improvements. Perform failure analysis and troubleshooting as required. Analyze test results, detect issues and track root causes. Requirements What we expect from you: Bachelor’s degree in Electrical Engineering, Computer Science, Physics, or relevant field. 3 – 7 years’ of work experience in a manufacturing environment or similar. Working knowledge of standard electrical tests and test equipment such as voltmeters, power supplies, oscilloscopes, etc. Ability to perform basic statistical analysis of test data using statistical tools, such as Minitab. Working knowledge of NI LabVIEW software. Excellent problem-solving, teamwork, communication, analytical, and organizational skills. Self-motivated and self-driven. Basic PC skills including Windows, Excel and Word. Proficiency with technical writing. What we would like to see: Experience within the medical device manufacturing industry Working Conditions: Work is performed in a normal R&D laboratory, controlled assembly area, and clean room environments. Capability of lifting light loads. Ability to travel for business as required. May be required to be fully vaccinated against the COVID-19 virus and other diseases. Benefits What we offer: CVRx is proud to offer competitive salaries and benefits plans. We offer a culture of teamwork, collaboration, and positivity, where challenging the status quo is welcomed, continuous learning is valued, and each of us has an opportunity to make a significant impact in an exciting, purpose-driven startup environment while also having fun. Salary (or Hourly) range for U.S locations (USD): 85,000 - 90,000 per year. The base salary range is applicable across the U.S., complies with federal and local regulations and may vary based on factors such as experience, certification/education, market conditions, and specific location. We also offer a competitive benefits package, details listed below: Competitive Health & Dental Insurance options with generous Company contributions Company contributions to an HSA with a high deductible insurance plan selection 401(k) with a company match Employee stock purchase plan & stock option grants 12 company-paid holidays per year in addition to generous PTO Generous paid time off for new parents Company-paid life insurance & disability options Unlimited growth opportunities Training & learning opportunities Flexible Schedules EEO statement CVRx, Inc. provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state, or local laws.    This policy applies to all terms and conditions of employment, including recruiting, hiring, placement, promotion, termination, layoff, recall, transfer, leaves of absence, compensation, and training.  If you're an independent, self-motivated individual with excellent interpersonal skills, a desire to do great things and have a background in medical devices, healthcare or a related field, we want to hear from you!   If you need assistance or an accommodation due to a disability, you may contact us at hiring@cvrx.com.  This requisition will be open until filled.   
Minneapolis, MN, USA
$85,000/year
Workable
Project Manager
If you're passionate about the design and function of the built environment, find beauty in and want to protect the natural environment, and want to work with others that feel the same, join our team! LaBella’s multi-disciplinary team of architects, designers, engineers, managers, and environmental scientists work every day to make our world more functional, beautiful, and safe. LaBella is an employee-owned engineering firm of approximately 2,000 staff and growing! We are seeking a highly motivated individual with an entrepreneurial spirit to join a dynamic team working on exciting, multi-phase, technically engaging, and impactful projects. The successful candidate will be responsible for managing NYSDEC Spill projects, Phase II Environmental Site Assessments (ESAs) in support of real estate transactions and managing sites in the NYSDEC Brownfield Cleanup Program (BCP) including Site Characterizations/ Remedial Investigations, Remedial Alternative Analysis/Remedial Design work and remediation projects. Prior experience with assessing feasibility/cost and detailed design for excavation and off-site disposal projects, in-situ chemical injections (oxidant and reductant approaches), sub-slab depressurization systems, and other remedial systems is required. The successful candidate will work with junior engineers, geologists and environmental scientists to design and manage field work including groundwater, soil, soil vapor, and surface water sampling, manage and evaluate field and lab data, supervise contractors and drillers, and support the preparation of reports and conduct review of reports developed by junior staff. This individual will be responsible for cost estimating, proposals, invoicing, and client management. Prior experience with environmental investigations and remediation at E-Designation projects is a plus. This position may have some limited fieldwork at times. LaBella offers excellent training and career advancement opportunities and outstanding benefits. Duties: Proposal writing, project setup, ensuring staff understand health & safety and project scope details, project execution. Heavy client communication. Preparing/reviewing deliverables on time and within budget, including invoicing. Reviewing and organizing field data in a concise manner. Data presentation and assessment and report preparation/review. Training/mentoring junior staff. Business development. Maintaining open communication with project team members, the client and regulatory agencies. Representing the company in a professional manner and in line with firm's core values. Conducting work to professional standards and following firm's safety and QA/QC policies. Requirements B.S. degree in Engineering (Chemical or Environmental), Geology or Envi NY State Licensed Professional Engineer or Professional Geologist a bonus 8-16 years of experience managing Phase II ESAs and Brownfield Cleanup Program projects. Federal experience a bonus. Ability to work independently and as part of a team Ability to work in a fast-paced environmental consulting team environment. Ability to work within a multi-disciplined group of professionals. Strong communication skills (active listening, written, and verbal) Organized with strong attention to detail Highly motivated, with excellent client service skills and a positive attitude Strong problem-solving skills Valid NYS driver’s license, lean driving record, and reliable transportation Salary Range: ($80,000 - $100,000) The specific salary offered may be influenced by a variety of factors including but not limited to the candidate's relevant experience, education, and work location. Benefits Body, mind, and wallet—LaBella’s benefits support a holistic approach to your health and wellness, creating the foundation for physical, mental, and financial well-being. Our benefit offerings cover the must-haves (healthcare and retirement), the just-in-cases (insurances and employee assistance programs), and the cherry-on-tops (fitness reimbursements, year-end incentive pay, and tuition assistance). Visit our website for more details on benefits listed below. Flexible Work Schedule Health/Dental Insurance 401k Plan with Employer Match Short & Long Term Disability Profit Sharing Paid Time Off Leadership Development Program Fitness Reimbursement Tuition Reimbursement Referral Bonus Program Wellness Program Team Building Events Community Service Events
Patchogue, NY 11772, USA
$80,000-100,000/year
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.